Period Overview

The Period Overview tab of the Schedule plan form offers a detailed view over planned material needs over selected periods of time.
The tab contains filter for the selection of the data displayed in the table below. The table is divided into two part. First part displays basic data about the line item of the plan and the second part displays the needed quantity of the line in selected time period (day, week, month).
 |
HINT
For more information about the Schedule plan, see the chapter Schedule plan.
|

Below is a description of the form’s features:
In this section you can select the time period for which the data in the Line needs by the period section will be displayed.
Different fields will appear according to the period selected for displaying data by the selected range.

Date From
|
Enter the start date of the desired time period.
|
to
|
Enter the end date of the desired time period.
|

Week From
|
Enter the number of the start week in the year of the desired time period.
|
To
|
Enter the number of the end week of the desired time period.
|
Year From
|
Enter the year of the start week of the desired time period.
|

Month From
|
Enter the number of the start month in the year of the desired time period.
|
To
|
Enter the number of the end month of the desired time period.
|
Year From
|
Enter the year of the start month of the desired time period.
|
By using filters you can select the data being displayed in the table.

Item
|
Enter or select from the drop-down menu the ID of the item from Items register.
|
Name
|
Enter or select from the drop-down menu the name of the item from Items register.
|
Prim. Category
|
Enter or select from the drop-down menu the Primary Category of the item.
|
Sec. Categ.
|
Enter or select from the drop-down menu the Secondary Category of the item
|
Item Type
|
By checking the corresponding checkbox, select the desired Item Type.
|
Show only items with needs
|
By checking this checkbox, only lines with insufficient quantity will be displayed.
|
Refresh
|
By clicking the button, data according to filters and selected time period is displayed in the table.
|
In this section of the table, the basic data of the plan lines is displayed.
Item
|
Displays the ID of the line item from Items register.
|
Name
|
Displays the name of the line item fromItems register.
|
U/M
|
Displays the unit of measurement of the line item.
|
Total
|
Displays the total material need of the line item.
|
In this section the line needs by selected period (see section 1. Time period selection of this chapter) are displayed.
Every column in this section of the table represents a period chosen (day, week, month). In each line, a material need for that period is displayed.
By clicking on the eye icon (
) you open Item Planed Qty Overview form, for detailed view over item planed quantities.
