Operations – MF

The form Operations is used to view the lines of the work operations on a work order (WO).
The form shows all WO work operation lines, their general information, the progress in percentage and graphically, the status and the number of already reported work operations and the planned work operations per line.
To open the form, select Manufacturing | MF Work orders from the menu and click one of the WO cards. The tab Operations opens by default.
 |
HINT
Clicking an operation card opens the form Completed work for reporting the completed work for the selected line. For more information on the form, see the chapter Completed work.
|

Below is a description of the form's features:
The form toolbar contains buttons and tabs to navigate between the forms in Manufacturing.
For more details on the toolbar, see section 1. Toolbar in the chapter Work order – MF.
The header of the form shows information on the WO. Operations can be filtered by resource.
|
Number
|
Number of the WO that is made up of the year of creation of the WO, the WO document type and the consecutive number of the WO.
|
|
Item
|
The ID of the WO item from the Items register.
|
|
Resource
|
From a drop-down list, select the resource from the Resources register by which you want to filter operations.
If filtering by resource has already been used on the MF Work orders list form, the selected resource is already entered in the field.
|
This part of the form shows all work operation cards.
Each work operation card (shown in the image at the beginning of this chapter and detailed in the image below) contains general information about the work operation line.

(Work indicator) |
Visible if time is being recorded for the operation.
If you hover with the mouse cursor over the indicator, the Completed work window appears with information on the start of the operation and the user assigned to it. |
(Materials for operation) |
If you hover with the mouse cursor over this icon, the Materials for operation window appears with the details of the materials on the WO linked to the operation.
The same information is displayed as on the material card tab on the Materials tab. |
| Operation |
The ID and the name of the operation item from the Items register. |
| Resource |
The ID and the name of the resource linked to the operation. |
| # (Line no.) |
The number of the line where the item is located on the WO BOM. |
| Production date |
The planned time of completion of the operation in hours (e.g. 15:21–17:06). |
| Progress bar |
Graphical display of the progress in the work completed or received quantities for this operation. |
| Status (progress in %) |
The progress of the operation. There are two line statuses:
- Open – The status indicates that the quantity of completed work does not yet correspond to the planned quantity or that all completed work for this line has not yet been reported.
- Finished – The status indicates that the total planned quantity of work has been completed or that all completed work for this line has been reported.
The progress of completed work or received quantities is shown as a percentage in brackets.
|
| Reported/planned time |
The reported and planned time of operation completion. Displayed in the following format: 1.27/1.40 MHR, which means that 1.27 man-hours of 1.40 man-hours have been completed. |
Appears if you hover with the mouse cursor over the work indicator.

|
Operation started
|
The date and time at which time recording for the operation has started.
|
|
Employee
|
The employee who is performing the work for the operation.
|