Resource hierarchy
RESOURCES are divided into four tabs:
- SELF-PROPELLED
- IMPLEMENTS
- WORKERS
- MATERIAL
- Already selected Resources within expert model are entered automatically, with possibility to edit Plan area (ha) and Scheduled start date.
- Adding additional Resources can be done by drag-drop from right located codebooks; codebooks display according to focus within Resource hierarchy structure automatically.
SELF-PROPELLED

Self-propelled |
Automatically displayed self-propelled ID; if within Expert model version a Resource type is set only Name field is entered ( with Resource type name), if within Expert model version an individual Self-propelled is set, Resource ID is displayed automatically
Double click on Self-propelled ID
|
Name |
Automatically displayed self-propelled Name |
Plan area (ha) |
Automatically displayed plan area regards selected CA; editing possible
Plan area division regards multi entering of Self-propelled
|
Plan Time QTY |
Automatically calculated Planned Time qTY regards previous entered Plan area
Plan area division regards multi entering of Self-propelled
|
Scheduled Start Date |
Automatically displayed planned start date and time; editing possible
Time setting for Scheduled start and end time
|
Scheduled End Date |
Automatically displayed planned end date and time regards Plan time QTY
Time setting for Scheduled start and end time
|
Actual start date |
Disabled; until Realization masks are not connected to Work order mask (stated May, 2017) |
Actual end date |
Disabled; until Realization masks are not connected to Work order mask (stated May, 2017) |
Note |
Possible to edit notes; in case note was added before, it is bolded |
Double click on Self-propelled ID
Double click on self-propelled ID opens form with additional Self-propelled´s specifications which are recorded within Agriculture Holding - Agriculture Machinery.

Plan area division, Plan Time QTY
In case within expert model version more Self-propelled are defined, a Crop area is automatically divided/splitted according to number of Self-propelled. Also Plan Time QTY is automatically calculated according to entered or manually edited Plan area for each self-propelled.

Scheduled Start/End Date/time
In case more Self-propelled are assigned to one Crop area (within one Work order), starting to adding first Self-propelled with Plan area lower as CA AREA, every followed Self-propelled automatically gets a calculated plan Area; manual editing possible.
Scheduled Start Time is copied from Scheduled start tasks Time and copied to all self-propelled assigned to task; Currently Self-propelled scheduled end Time is not uniformed/converted to Task scheduled End Time (within further development Scheduled task Start should be min. Resource Start date and meanwhile Scheduled task End should be max. Resource Start date).

IMPLEMENTS
Follows the same entering drag and drop process as in Self-.propelled.

WORKERS
For selected task you can add:
a) worker directly to tab worker (SUM-level),
b) within tab Managed assigned workers (SUB-level) within Self-propelled tab,
c) within tab Managed assigned workers (SUB-level) within Worker tab.
Follows the same entering drag and drop process as in Self-propelled.

Worker |
By drag-drop form right-located codebook a Worker ID is displayed automatically |
Name |
By drag-drop from right-located codebook a Name of Worker is displayed automatically; |
Plan Area (ha) |
Manually input of Plan area which is planned for selected Worker |
Plan Time QTY |
Automatically calculation due to Plan Area (ha) |
Scheduled Start Date |
Automatically displayed scheduled start date as it is preset in Task |
Scheduled End Date |
Automatically calculation according to Plan Area and Time/ha (in Task) |
MATERIAL
All material which is defined within expert model is displayed within tab Material; material could be added manually by drag and drop process.

Item |
After drag-drop from right-located codebook automatically displayed Item |
Description |
After drag-drop from right-located codebook automatically displayed Item Description |
Warehouse Plan |
Automatically displayed Warehouse which is displayed in bellow Resource window |
Plan QTY/ha |
Automatically entered data (if user works with Expert models version); manually entering enable |
Plan QTY |
Automatically calculation of QTY due to Plan QTY/ha and Plan Area |
UM |
Unit of measure |
Note |
Possible to edit notes |
Plan area distribution regards multi entering of Resources
In case more Resources are selected within expert model for individual task an automatically division of plan area is made. The same concept applies for all tabs (Resources/Self-propelled, Attachment, worker). In case of adding additional resource manually Plan data Area need to be corrected for all preset records.