PANTHEON™ Help

 Toc
 PANTHEON Ajutor - Bun venit
[Collapse]PANTHEON
 [Collapse]Ghiduri pentru PANTHEON
  [Expand]Ghid pentru PANTHEON
  [Expand]Ghid pentru PANTHEON Retail
  [Expand]Ghid pentru PANTHEON Vet
  [Expand]Ghid pentru PANTHEON Fermă
 [Collapse]Manuale de utilizare pentru PANTHEON
  [Expand]Manual de utilizare pentru PANTHEON
  [Expand]Manual de utilizare pentru PANTHEON Retail
  [Expand]Manual de utilizare pentru PANTHEON Vet
  [Expand]Manual de utilizare pentru PANTHEON Farming
[Collapse]PANTHEON Web
 [Collapse]Ghiduri pentru PANTHEON Web
  [Expand]Ghid pentru PANTHEON Web Light
  [Expand]Ghid pentru Terminalul Web PANTHEON
  [Expand]Ghid pentru PANTHEON Web Legal
  [Expand]Arhivă produse vechi
 [Collapse]Manuale de utilizare pentru PANTHEON Web
  [Expand]Începerea PANTHEON Web
  [Expand]Manual de utilizare pentru PANTHEON Web Light
  [Expand]Manual de utilizare pentru terminalul web PANTHEON
  [Expand]Manual de utilizare pentru PANTHEON Web Legal
  [Expand]Arhivă produse vechi
[Collapse]PANTHEON Granule
 [Collapse]Ghiduri pentru granule PANTHEON
  [Expand]Granul Personal
  [Expand]Comenzi de Călătorie Granule
  [Expand]Documente și Sarcini Granul
  [Expand]Tabloul de bord Granule
  [Expand]Comenzi B2B Granule
  [Expand]Granul de Serviciu pe Teren
  [Expand]Granul Inventar Active Fixe
  [Expand]Inventar de Magazin Granule
 [Collapse]Manuale de utilizare pentru granulele PANTHEON
  [Expand]Începerea
  [Expand]Granul Personal
  [Expand]Comenzi de Călătorie Granule
  [Expand]Documente și Sarcini Granul
  [Expand]Comenzi B2B Granule
  [Expand]Tabloul de bord Granule
  [Expand]Serviciul de teren Granule
  [Expand]Granul Inventar Active Fixe
  [Expand]Inventar de Magazin Granule
  [Expand]Arhivă
[Expand]Site utilizator

Load Time: 359,3647 ms
"
  6613 | 1 | |
Label


Alternates

The Basic BOM in PANTHEON allows you to use alternates which can simplify and quicken the process of manufacture preparation.

Below, read a case of creating a new alternative in a product's Basic Bill of Materials.

CASE SUMMARY:

Marc Manufacture is going to add a new alternative LARA MATERIAL 2 to the Basic BOM of item LARA3. The lines are added the same way they were added in previous cases. This is done as follows:

  1. Opening the BOM
  2. Adding an Alternate
  3. Adding Lines
  4. Displaying Alternates

1. Opening the BOM

The person responsible for opening the Basic BOM selects Settings | Manufacturing | BOMs | Basic BOM.

In the search engine in the toolbar, the person responsible finds item LARA3 and opens the linked BOM by selecting the item.

2. Adding an Alternate

On the left side of the BOM window, the tree structure of the BOM is visible. The structure displays all levels of the BOM and alternates according to filters selected above the structure.

HINT

In the tree structure, individual lines are marked with an icon representing the line type:
– Product
– Alternate
– Semi-finished Product

– Material

– Operation

 

To add a new Alternate, the person responsible right-clicks the mouse in the empty space in the BOM tree structure window and selects the Add alternate option.

This opens a new empty subform Alternate, where the alternate name and number can be entered into the Alternate fields. In this case, LARA MATERIAL 2.

The person responsible sets the Status to Confirmed and selects the Scheduling method By Technological Procedures.

By clicking the Active window, the person responsible activates the alternative and saves it by clicking the green tick. Alternate is immediately visible in the tree structure.

 

HINT

In PANTHEON, alternates can be used in two ways: with one active alternate or several active alternates. For more information, see the chapter Alternate Lines in Specifications.

 

HINT

In PANTHEON, you can also add a phantom to a BOM as an alternate. When creating work orders from a Basic BOM, the phantom will be added only as lines and a separate work order will not be created for the phantom.
For more information, see the chapter Phantom - Virtual Assembly.

3. Adding Lines

The person responsible adds lines to the Alternate just like in other cases. When entering lines, the person responsible must be careful to select the correct alternate number linked to the material or work operation from the drop-down menu.

4. Displaying Alternates

Selecting the BOM tab displays only active alternate lines.

To view lines of all alternates, the person responsible right clicks anywhere in the field and selects Show all alternates from the list.

The list now shows lines of all alternates.

 

HINT

After creating Alternates, you can save a lot of time by using the Copy BOM tool. You can view an example of using this tool in the chapter Copying BOMs.

 

 

  

     


Rate this topic
Was this topic usefull?
Comments
Comment will also bo visible in forum!