Dodajanje materiala, strojev in delavcev
Adding Material, Machinery and Workers
Selection of Self-propelled
Selecting of Self-propelled for previously (above) selected task:
- selection of Resource type (drop-down) or,
- drag-drop of individual resource from code book (right-located).


| Res. Group |
Selection from drop-down select Resource group (group of Self-propelled as defined in Agriculture panel / Settings / Agronomy / Planning/Resource group; currently no connection between Resource groups and Planning |
| Res. Type |
From drop-down. Choose from selection of self-propelled resource type. |
| Resource |
Entered automatically when individual self-propelled is added by drag&drop. |
| Name |
Entered automatically after:
a) selection of Resource type,
b) drag-drop of individual self-propelled |
| Plan Time Qty |
Quantity of resource; it is set automatically as fulfilled value Time needed/ha (usualy in hours) within task. |
| Note |
Entering notes possible. |
a) Creating Resource combination for main Resource Self-propelled
When selecting individual Self-propelled machine it is possible to assign individual implements, Workers and Material to selected Self-propelled.
Recommended rules for Resource combination: - Within EM only resource types selection: on EM level Resource type should be defined - Particular choice on 1st level (tabs) and on 2nd level (subtabs): user can choose or Res. Type or individual concrete Recourse on both levels of Resource hierarchy.
Image 6: SP= TRC + IMPL=PLG+ WRK=LB, or
Image 7: SP= TRC1 + IMPL= PLUG1 + WRK= Worker1) - Data editing is possible only on 2nd level: data are updated on 1st level
| SELF-PROPELLED |
Image 1; |
| IMPLEMENTS |
To enter Implement click Insert: Image 2 |
| MANAGED ASSIGNED WORKERS |
Assign worker to Self-propelled machine: Image 3 |
| MATERIALS |
Assign material to Self-propelled machine. Enter manually planned QTY for materials needed per hectare; Image 4
|
| FUEL |
When individual Self-propelled machine has determined type of Item regarding fuel, selected Item is displayed automatically and planned QTY of fuel needed per hectare is copied from Task data for Fuel; Image 5. |
Image 1: Click on Grey arrow and click insert

Image 2: Creating Resource combination for main resource Self-propelled

Image 3: Assign worker to Self-propelled

Image 4: Assign material to Self-propelled

Image 5: Assign Item regarding fueling
Image 6: Selection of Res. Type on both levels

Image 7: Selection of individual resource on both levels

Implements
Implements rules: - In tab Implements is a sum of all added Implements through tab Self-propelled. - In tab Implements we can not add new Implements by drag-drop. - In tab Implements we can delete record, and it will be deleted also where was initially entered.


| Res. Type |
Automatically displayed as assigned in Self-propelled. |
| Implements |
The name of individual Resource is entered automatically. |
| Name |
Name of individual Resource is entered automatically by saving the record |
| Plan Time QTY |
Time Quantity for planned Resource. It is set automatically as a fulfilled value from Self-propelled Plan time QTY |
| Note |
Entering notes possible |
 |
Resource as Self-propelled and Implements could be selected by:
a) selecting Resource type first,
b) selecting individual Resource directly (without selecting Resource type. In this case a Resource type will be added after saving record automatically.
|
Selection of Worker
Selecting a labor for previously (above) selected task:
- Selection of Resource type LBR (drop-down) or
- drag-drop of individual Worker from code book (right-located).

| Res. Type |
A Resource type of Labor is preset automatically |
| Worker |
Worker ID is displayed automatically (when individual Worker selected). |
| Name |
Name of individual Worker is added automatically by saving the record |
| Plan Time QTY |
Planned time for worker (usually in hours): a) it is set automatically as fulfilled value from Needed Time per ha (usually in hours) from Task, if Worker is added by drag-drop b) it is set automatically as fulfilled value from Plan Time QTY from Self-propelled if Worker is added onto Self-propelled |
| Note |
Entering Note possible |
a) Creating Resource combination for Workers
When selecting individual worker you can assign him individual Worker&Material.
| WORKERS |
worker on 1. level: Image 1; |
| MANAGED ASSIGNED WORKER |
Assign (sub) Workers to Worker on 1. level.
If subworker is added, main worker is displayed in bold. This functionality will be connected to Norm in further development: Image 1 |
| MATERIAL |
Assign materials to selected worker on first level Image 2 |
Image 1: Creating Resource combination for Workers

Print screen_2: Assign material to selected worker

Selecting of Material
Material rules: - In tab Material is a Sum of all added Material through Self-propelled and tab Worker - In tab we can not add new Material - In tab Material it is possible to delete Material. In that case, it is also deleted where Material was recorded initially.
| Material |
Automatically displayed material` s ID as recorded within Self-propelled or/and Worker tabs. |
| Desciption |
Automatically displayed name of material. |
| Plan Qty |
Quantity of planned material; data for unit per hectare |
| U/M |
Unit of material; as it is set within Items. |
| Note |
Entering notes possible. |