Pokalkulacija
Poscalculation - 6KR - Cost analysis - Detailed
Among all WO statuses, only statuses In progress, Partly finished and Finished results as report:
a) Partly finished & Finished (with any product harvested) - displays also data about Production costs/kg
b) In process & Finished ( with no product harvested, exp. of white mustrad ploughing- in) displays only data about Production costs/ha (production costs/kg is not calculated).
Calculations:
Cost /ha: SUM cost/ CA size ( Example: 279,53 / 1,02= 274,08)
Production: SUM cost / Produced (Example: 279,53/ 25497,50=0,0109)
Product/ ha: Produced/ CA Size (Example: 25797,50 /1,02 = 25000)

Filter hierarchy is enabled:
- all subordinate filters are filtered due to Document type selection (above) and WO Status (right).

Document types |
By selecting document type indirectly a target module is selected while each work order created within individual module requieres defined/specifics doc. types.
|
Product ID |
Records are filtered due to previous selected Doc. type |
Prim. category |
Displayed default primary category which is a predecessor in order to created Work order in specific modules; by CROP&VEGS primary category as CROP, by GRASS primary category as GRS. |
Sec. category |
Dislayed all secundary categories within previous selected Doc. type |
Order Date From - To |
Checks/looks among Plan start dates which are specified in Work orders header first AnNO). |
Movement From- To |
Checks/looks among Dates, where realization was recorded; on report there are all realization data shown. |
WO From- To |
In drop-downs all Word order due to previus filter Doc. types & WO status are displayed; when fullfill both fields with the same Word order-ID only one individual Word order is displayed. |
Start Time From - To |
Checks plan start date from Work order header |
End time From - To |
Checks plan end date from Work order header |
WO Status |
By default all status are checked / ON; no possibiltity to unchecked all. |