Operations – MF

The form Operations is used to view the lines of the work operations on a work order (WO).
The form shows all WO work operation lines, their general information, the progress in percentage and graphically, the status and the number of already reported work operations and the planned work operations per line.
To open the form, select Manufacturing | MF Work orders from the menu and click one of the WO cards. The tab Operations opens by default.
 |
HINT
Clicking an operation card opens the form Completed work for reporting the completed work for the selected line. For more information on the form, see the chapter Completed work.
|

Below is a description of the form's features:
Contents
- Toolbar
- Header
- Work operation cards
|
1. Toolbar
The form toolbar contains buttons and tabs to navigate between the forms in Manufacturing.
For more details on the toolbar, see section 1. Toolbar in the chapter Work order – MF.
2. Header
The header of the form shows the number and the related item (finished product, semi-product) of the WO.
For more details on the form header, see section 2. Header of the chapter Work order – MF.
3. Work operation cards
This part of the form shows all work operation cards.
Each work operation card (shown in the image at the beginning of this chapter and detailed in the image below) contains general information about the work operation line.

| Operation # |
The number of the line where the operation item is located on the WO BOM. |
| Operation |
The ID and the name of the operation item from the Items register. |
| Resource |
The ID and the name of the resource linked to the operation. |
| Production date |
The planned time of completion of the operation in hours (e.g. 15:21–17:06). |
| Progress bar |
Graphical display of the progress in the work completed or received quantities for this operation. |
| Status (progress in %) |
The progress of the operation. There are two line statuses:
The progress of completed work or received quantities is shown as a percentage in brackets.
|
| Reported/planned time |
The reported and planned time of operation completion. Displayed in the following format: 1.27/1.40 MHR, which means that 1.27 man-hours of 1.40 man-hours have been completed. |
 |
IMPORTANT