Помощ за PANTHEON™

 Категории
 PANTHEON Help - Welcome
[Collapse]PANTHEON
 [Collapse]Упътства за PANTHEON
  [Collapse]Guide for PANTHEON
   [Expand]Settings
   [Expand]Orders
   [Expand]Goods
   [Collapse]Manufacturing
    [Expand]Manufacturing Scheduling (MF)
    [Collapse]Simple Manufacturing
     [Expand]Work Orders
     [Expand]Cost Analysis
     [Expand]Work Order Reports
     [Expand]Norm Attainment
      Issue Overview
      Manufactured Products Overview (Serial Numbers)
     [Expand]Re-export
      Work Order Processing
      Relieving Inventory
      Creating Work Orders
      Cost Price Calculation in Work Orders
     [Collapse]Examples
      [Expand]Dismantling of products
       Shrinkage - Introduction
       Material Shrinkage - GROSS
       Material Shrinkage - NET
       Product Shrinkage - NET
       Product Shrinkage - GROSS
       Manufacturing Using Multi-Level Specification
       Processing Service Work Order - Type U
       Work Order for Product with Checked Serial Number Tracking
       Formulas Used in Evaluation of Internal Receiving and Issues - WO
       Manufacturing and Integrated Standardized Service
      [Expand]Sub-contracting
      [Expand]Simple Manufacturing
    [Expand]MT Manufacturing
    [Expand]ZEUS production cube
   [Expand]POS
   [Expand]Service
   [Expand]Financials
   [Expand]Personnel
   [Expand]Analytics
   [Expand]Desktop
   [Expand]Помощ
   [Expand]Messages and Warnings
   [Expand]Additional programs
  [Expand]Ръководство за PANTHEON Търговия
  [Expand]Ръководство за PANTHEON Vet
  [Expand]Ръководство за PANTHEON Фермерство
 [Collapse]PANTHEON потребителски ръководства
  [Expand]Ръководство за потребителя за PANTHEON
  [Expand]Ръководство за потребителя за PANTHEON Retail
  [Expand]Ръководство за потребителя за PANTHEON Vet
  [Expand]Ръководство за потребителя за PANTHEON Farming
[Collapse]PANTHEON Web
 [Collapse]PANTHEON Web Guides
  [Expand]Ръководство за PANTHEON Web Light
  [Expand]Ръководство за PANTHEON Web Terminal
  [Expand]Ръководство за PANTHEON Web Legal
 [Collapse]PANTHEON Web User Manuals
  [Expand]Започване на PANTHEON Web
  [Expand]User Manual for PANTHEON Web Light
  [Expand]Ръководство за потребителя за PANTHEON Web Terminal
  [Expand]Ръководство за потребителя за PANTHEON Web Legal
[Collapse]PANTHEON Гранула
 [Collapse]Ръководство за PANTHEON Гранули
  [Expand]Гранула за служители
  [Expand]Пътнически нареждания Гранула
  [Expand]Гранула за документи и задачи
  [Expand]Гранула Табло
  [Expand]Гранула за B2B поръчки
  [Expand]Гранула за обслужване на клиенти
  [Expand]Гранула за опис на дълготрайни активи
  [Expand]Гранула за складови наличности
 [Collapse]PANTHEON Granules
  [Expand]Започване
  [Expand]PANTHEON Granule Work records
  [Expand]PANTHEON Granule Travel orders
  [Expand]PANTHEON Granule Documents and Tasks
  [Expand]PANTHEON Granule B2B orders
  [Expand]PANTHEON Granule Dashboard
  [Expand]Полеви сервизен гранул
  [Expand]Инвентаризация на дълготрайни активи
  [Expand]Инвентаризация на склада Гранула
[Expand]Потребителски сайт

Load Time: 750,0175 ms
"
  1065 | 1370 | 400291 | Localized
Label

Proizvodnja pri večnivojski kosovnici

Manufacturing Using Multi-Level Specification

Manufacturing Using Multi-Level Specification

010381.gif010411.gif010382.gif

Let us take a look at a company manufacturing semi-finished products which are then used in production of products.

Create product PRODUCT02, in production of which the following are used

  • SEMOPROD01 including own specification:
    • MATERIAL01, 2 pieces
    • MATERIAL02, 1 piece
    • OPERATION01, 2 hours

     

  • SEMOPROD02 including own specification:
    • MATERIAL03, 0.5 pieces 
    • OPERATION02, 0.75 hours

     

  • MATERIAL04, which represents a simple component

Below you can observe product specification for PRODUCT02:

 

000001.gif Use two separate work order document types in manufacturing semi-finished products and products (both of them are predefined):
  • 600 - used in production of products
  • 6P0 - used in production of semi-finished products

How do we proceed from here?

1. Material IDs

First enter IDs of child items, that is:

MATERIAL01, MATERIAL02, MATERIAL03 and MATERIAL04; OPERATION01 and OPERATION02

2. Specifications of Semi-finished Products

Proceed by creating specifications of semi-finished products which are further used in product specification.

IMPORTANT: To issue semi-finished products to further production open document type 6P0.

3. Product Specification

Finally you can create product specification.

IMPORTANT:To issue products to further production open document type 600.

4. Work Order

Issue work order for product. PRODUCT02 is represented by an item containing child items. That is why you have to first issue work order using document type 600. Let us say we want to manufacture 2 products:

000001.gif Because the parent item consists of child items which contain own specification, work orders are created for child items in the selected document type immediately after clicking confirmation button.
 

In our case it handles of document type 6P0 using which SEMIPROD01 and SEMIPROD02 are created in standardized required quantities.

5. Processing Work Orders

Process work orders from bottom level up. To provide required semi-finished products in production you have to manufacture them.

First process work orders using document type 6P0. Then proceed with work orders using document type 600.

6. Cost Analysis

Cost analysis of work order - When creating a parent item, or better, product it displays materials and semi-finished products used in the process; that is, detailed data related to semi-finished products.

 

 


 

Оценете темата
Темата беше ли ви полезна?
Коментар
Вашият коментар ще бъде видим и във форума!