Completed work – MF

The form Completed work makes it easy to report the work completed for the selected WO operation. You can also report the quantity of good and scrap pieces as well as pieces for repair produced. Previously completed work for this work operation can also be viewed.
The duration of work completed can be reported using the automatic time recording function (function Start-Stop), which simplifies work with the program, because the program automatically records the duration of work instead of keeping the time manually.
To search for a specific work order or several, we use filters.
This chapter describes how to select a work operation on a WO, use the automatic time recording function, report quantities and check the work completed for an operation.
 |
CASE SUMMARY
The person responsible wants to start work on an operation. In PANTHEON Web Light, the person responsible opens the form Work orders and enables the toggle button "Data from daily plan" to find the WOs that are scheduled for processing. The person responsible selects WO 23-6000-000013 and operation #20 O-Hemming. The person responsible records the manufacturing time using the function Start-Stop. When the job is finished, the person responsible reports the quantities produced and confirms the operation. This is done as follows:
- Opening the form MF Work orders
- Selecting the WO to be processed
- Selecting the desired operation
- Using the automatic time recording function
- Reporting the quantities produced
- Checking the work completed
|
1. Opening the form MF Work orders
In PANTHEON Web Light, the person responsible selects Manufacturing | MF Work orders from the main menu.
This opens the form Work orders with all the WOs created in the period of one year.

Next, the person responsible selects the WO to be processed.
2. Selecting the WO to be processed
Filters are used to select one or more work orders.
There are several different filters available: Search is a general keyword search filter, all other filters have a drop down list.

 |
HINT
When filtering, it is important to note that the last selected filter is always saved. This avoids re-setting. If you want to reset the filters, there is a clear icon which deletes all the search criteria entered in the filters at the same time.
|
In the toolbar of the form, the person responsible enables the toggle button Data from daily plan.
Only WOs that are scheduled for processing in the daily plan are displayed in the list.

From the list of WOs, the person responsible clicks the WO card with the WO number WO 23-6000-000013 and item line LARA3_FLY.
This opens the form Operations, where the cards of the planned work operations are displayed.
Then, the person responsible can report the work completed for this work operation.
3. Selecting the desired operation
The person responsible clicks the work operation card Operation #20 O-Hemming.

This opens the form Completed work.
Then, the person responsible uses the automatic time recording function to track operation time.
4. Using the automatic time recording function
The person responsible uses automatic time recording (function Start-Stop) by simply clicking the button Start in the form header when the person responsible starts working.

The program starts to track the time automatically, which can be monitored on the timer.
The date and time of the start of the work is automatically populated in the field Operation started.
 |
HINT
When the time count is active on the form, manually entering quantities in the fields is disabled.
To pause the timer press the Pause work button. The timer continues by pressing the button Continue.
|
When the person responsible finishes the work operation, the person responsible stops time recording by clicking the button End.

The time reported for the operation is recorded in the field Time used.

Then, the person responsible can report the quantities produced.
5. Reporting the quantities produced
In the field Good pcs, the person responsible enters the number of good pieces produced, in this case: 2.
Next, the person responsible confirms the quantity of good pieces produced and the time reported.
This is done by enabling the toggle button Confirm receiving in the footer of the form and clicking the button Confirmation in the header of the form.

The program displays information that the record on the work completed has been successfully created. The window is closed by clicking the button OK.

The person responsible then checks the work completed.
6. Checking the work completed
In the section Work history, the person responsible can see the details of the work reported immediately after the record on the work completed has been successfully created.

The person responsible clicks the button X (Close) to return to the form Operations.
The graphically and numerically displayed data on the work operation card Operation #20 O-Hemming indicates the progress in the completion of this operation.

 |
HINT
All of these options are available on smartphones and tablets as well.
|