After we created new plan, we have to do the following:
1. Tab Fields:
On Tab Field we enter new field. Fields could be added one by one ...

... or via multi selection (Right-click on Fields)

After selecting more fields in grid (ctrl+select) or on Maps, click on Confirm button and selected fields will be added to tab Fields at once.

At the same time Fields with their defined Crop areas are displayed on gantt.

Example: Field »By the river 200« is divided into 2 crop areas – displayed as two parallel green time-lines. Field »By the river 100« with 1 crop areas is displayed with one green time-line.
If Field is checked (mark ON, right side of upper image) results in Field`s display on gantt. If Field is unchecked, it is not seen on gantt.

For easier searching and adding new Fields to a plan, there is an option to search Fields by name.

2. Tab Crop
In order to connect EM to CA, we have to enter the type of crop in the crop tab. Type of crop is defined as secondary category within Item settings. If there is a need for new secondary category, it can be added in module Items Categories.
After all settings are done, creating new Crop can start, by adding new Crop.

If it`s all correctly set including secondary category on crop, user will see in sub-table of Crop type, all possible Expert models with at least one EM version, that are already created for this type of crop.

The table is consisted of three main groups:
1. General
2. Quantity
3. Area
General |
|
Crop |
From dropdown the crop is chosen. Data in dropdown are Secondary category created in codebook for Items, |
Quantity |
|
Target |
Target is Total quantity of the Product that we want to produce. This data is entered manually. For now this data has no linked controls. |
Planned |
"Planned" is calculated automatically and represents planned amount of the Product. When EM is drag-dropped onto selected CA, program calculates expected middle value from EM and multiply with the size of the area and displays it as Planned. |
U/M |
Unit of measure for product. |
Area |
|
Target |
Target the area that user wants to process. This data is added manually. For now this data has no linked controls. |
Planned |
Planned is calculated automatically and represents planned amount of the area. When EM is drag-dropped onto selected CA, program takes the size of the CA. |
U/M |
Unit of measure for Field. |

3. Tab Planned Crop
After CROP is assigned to individual Crop area, the data within Planned crop (read-only tab) can be seen.