Plan order tab
Plan order
Here we can overview whole production plan for Crop areas we have created. To see how to assign EM`s to particular Field -> CA, click here: Assign Crop to CA. When we connect Expert model version with Crop area, we get all information that are important in this tab.
For each plan order data are presented within tabs:
1 Plan order
Plan order hierarchy:
1 Plan order: each record is result of drag&drop od Expert model version to individual crop area
1.1 Tasks: for each plan order positions as tasks are recorded
1.1.1 Resource hierarchy: for each task adding of Machinery and Worker and Material is enabled

1. Plan orders
Line |
Sequential position number. of plan order. |
EM |
The name of Expert model (Item); read- only, could be changed by right-click "Change plan order" |
Version Name |
The name, description of Expert model; read- only. |
Version |
Version of expert model; read- only. |
Crop Type |
Information if Crop is Main or Catch = Additional crop (additional crop, produced after main crop in the same season);
If recorded within expert model version it is displayed automatically. |
Plan Total |
Total plan of production. Calculated from Crop area size and expected Yield middle value, as recorded in EM version.
Expected CA area is 20 ha
Middle value on Expert model for chosen version is 35.000 kg
20 ha x 35.000 kg = 700.000 kg
|
Plan /ha |
This data is recorded as middle value in expert model version. |
U/M |
U/M that is set on Item. |
Start Time |
The Start date of first task on chosen version of expert model. |
End Time |
The End date of ending of last recorded task task of expert model version. |
Crop area ID |
Crop area ID; double click opens Crop area data in Agriculture holding. |
CA Name |
Name of Crop Area, read- only |
CA Area |
The size of crop area in hectares; read- only |
Soil analysis |
Functionality not active yet (Stated, July 2019) |
Note |
Entering Note; copied from EM (if reported) |
WO |
Work order could be created from Plan order. In this case Work order ID is displayed here and
meanwhile Plan order becomes read-only grid. Creating Work order form plan is described within
Creating WO. Double clik opens Work order form. |
1.1 Tasks
Entering of sequential task as a Line/position of individual plan order is presented.
Line |
Task position, entered automatically as a sequential task. Displayed according to Expert model
Version positions. Line step defined in Agriculture panel / Manufacturing / Specs |
Task |
Automatically displayed as set in expert model version. |
Name |
Task Name is entered automatically |
Version |
Version of expert model, automatically. |
Time /ha |
Automatically displayed of needed time for operating task per hectare (in hours) as set within EM version; can be changed. |
Plan Time QTY |
Automatically calculated from Time/ha multiplied with Crop area size.
|
U/M |
Unit of measure |
Scheduled Start |
Plan start date displayed as set in expert model version. Can be changed.
Plan start hour displayed as set in Agriculture panel / Settings / Agronomy / Planning / tab Worker: general resource settings. Can be changed. |
Scheduled End |
Automatically calculated according to Planned Start date and Crop area size |
Phenological Phase |
Select phenology stage from drop-down menu.
If recorded in EM version it is displayed automatically. |
Reason |
Manually written reason, usually a reason to prevent disease/pest/weed spreading. If recorded in EM version it is displayed automatically. |
Fertilization type |
Selection drom drop-down; connected to Nutrition tab. |
Task editing rules:
Adding Task could be done by:
a) inserting Task by already written Line/position` s number (saving inserted record results in renumbering of all followed Lines/positions). If inserted position number is not divisible with position range, inserted position will be automatically added as last position of plan order.
b) inserting Task by new Line/position` s number (saving inserted record results in display of last line/position` s number,
c) adding Task as a last positions, deleting lines/positions results in no changing of line/position`s number.
1.1.1 Adding Machinery, Workers and Material
Resources (Machinery & Workers) and Material are added to individual position by drag&drop.
The process of drag&drop is the same as on Expert model, with some different rules:
Resources rules:
- Resources are added to individual task by drag&drop from Resource&Material Codebooks (right-located).
- Within Plan both resource type or individual resource could be added
- Added resource could be assinged as parent resource (drag&drop directly) or as a child resource (drag&drop onto existing parent resources)
- Deleting of parent resource results in deleting of all assigned resources & material
- Adding first parent resource results in taking over data Time/ha, calculated due CA size
- Adding additional parent resources results in re-calculation of Plan Time QTY for all assigned resources

- Changes of task norm up-dates Plan Time QTY for resources.

2. Material rules:
- Material is assigned by drag&drop process
- Material could be assigned only to parent resource
- Selection of werehouse is enabled
- Enabled alternate entry of Plan QTY / ha and Plan TY data
a) Material / Group by resources: Summary overview of materials=ident types according to resources

Item |
Automatically displayed after drag&drop process. |
Name |
Automatically displayed after drga&drop process. |
Warehouse |
Select Warehouse planned |
Plan QTY |
Entering quantity requirements for hectare
|
U/M |
Unit of measure |
b) Material/ Group by materials: Summary overview of material=ident quantities. Collapsed view enabled.

Resouce codebooks right - located detail specification described within Resource &material Codebook.
Mendatory inputs on mask for Plan , tab Plan order
If we add new task on created Planned order, than this data are mandatory:

3 Products
Within Products all data recorded on Expert model are displayed with possibility to edit it.

Type |
Selection of Product type:
- A- Additional product
- S- By-products
|
Item |
Selection of all Products with primary category CROP ( within CROPs&VEGs module) or GRS ( within GRASS module). Not possible to enter the same Product, a notification apperas:

|
Name |
Name of Item |
U/M |
Unit of measure |
Plan QTY |
Enter QTY of planned Product:
- Additional product: default display of MAX. planned QTY of Main products; edit it
- By- products: enter plann QTY expected for hectare
|
Percentage |
Automatically calculated after saving plan QTY by additional product; read- only field. |
Task No |
When By- products is selected: Select task from Expert model task, which are connected to by- products production; Obligatory field.

|