Manufacturing Time Report
Manufacturing Time Report
Manufacturing Time Report
 |
Create a teport of manufacturing time as:
- Summary - using Manufacturing Time command in the wizards menu
- Detailed - opening Manufacturing Time tab in the Operations panel of the Product Specification and click Show Manufacturing Time.
Manufacturing Time Report - Summary

Item |
To display summary data of a specific product enter or select its ID. |
Description |
Enter or select name of item to restrict display of summary data by a specific product. |
U/M |
Displays a unit of measurement used with product. |
Item Type |
Enter or select type of item to restrict selection. |
Prim. Categ. |
Enter or select primary category to restrict selection. |
Sec. Categ. |
Enter or select secondary category to restrict selection. |
Quantity |
Displays prodoct quantity for which an amount of manufacturing time was calculated. It represents the optimum product quantity which is set in product specification. |
Manufacturing Time |
Displays the total manufacturing cycle time required in production. It is expressed in hours. It represents the period from the start of the first operation and end of the last operation. Here are used the specified available resource where operations are carried out. |
Manufacturing Time Report - Detailed

Line |
Displays line number of operation as set in the technological procedure. |
Operation |
Displays number pf operation as set in the technological procedure. |
Name of Operation |
Displays a name of the operation. |
Offset |
Displays offset from the start of the first operation till the beginning of the selected one. It is expressed in hours. |
Duration |
Displays standard time required for carrying out a specific operation. It is expressed in hours. (Tpr + Tsu - when taken into account) |
Resource |
Displays an ID of resource where the selected operation is executed. |
Name of Resource |
Displays anme of resource where an operation is executed. |
Below the specification you can see total manufacturing time expressed in hours - total Tpr + Tsu.