PANTHEON™ Help

 Toc
 PANTHEON Help - Welcome
[Collapse]PANTHEON
 [Collapse]Guides for PANTHEON
  [Expand]Guide for PANTHEON
  [Expand]Guide for PANTHEON Retail
  [Expand]Guide for PANTHEON Vet
  [Expand]Guide for PANTHEON Farming
 [Collapse]User Manuals for PANTHEON
  [Expand]User Manual for PANTHEON
  [Expand]User Manual for PANTHEON Retail
  [Expand]User manual for PANTHEON Vet
  [Expand]User Manual for PANTHEON Farming
[Collapse]PANTHEON Web
 [Collapse]Guides for PANTHEON Web
  [Expand]Guide for PANTHEON Web Light
  [Expand]Guide for PANTHEON Web Terminal
  [Expand]Guide for PANTHEON Web Legal
  [Expand]Old products Archive
 [Collapse]User Manuals for PANTHEON Web
  [Expand]Getting started PANTHEON Web
  [Expand]User Manual for PANTHEON Web Light
  [Expand]User Manual for PANTHEON Web Terminal
  [Expand]User Manual for PANTHEON Web Legal
  [Expand]Old products Archive
[Collapse]PANTHEON Granules
 [Collapse]Guides for PANTHEON Granules
  [Expand]Personnel Granule
  [Expand]Travel Orders Granule
  [Expand]Documents and Tasks Granule
  [Expand]Dashboard Granule
  [Expand]B2B Orders Granule
  [Expand]Field Service Granule
  [Expand]Fixed Assets Inventory Granule
  [Expand]Warehouse Inventory Granule
 [Collapse]User Manuals for PANTHEON Granules
  [Expand]Getting started
  [Expand]Personnel Granule
  [Expand]Travel Orders Granule
  [Expand]Documents and Tasks Granule
  [Expand]B2B Orders Granule
  [Expand]Dashboard Granule
  [Expand]Field Service Granule
  [Expand]Fixed Assets Inventory Granule
  [Expand]Warehouse Inventory Granule
  [Expand]Archive
[Expand]User Site

Load Time: 390.6266 ms
"
  6613 | 1 | |
Label


Expert models


 

Expert models mask displays the process of entering sequenced  task within selected expert model (EM). Expert model is a kind of agro-technological map with task and all resources ( type of machinery, type and quantities of materials, labour) included which are needed for production of selected agriculture plant.There are two was for entering Expert model versions: a) by importing through web service or b) by creating new expert model direct in Expert model mask.

PLACEMENT INTO PLANNING PRODUCTION:

Picture 1: Menu "Expert model" placement into planning production

Expert model is a technologic map/plan/recipe for plant production with related information about resource and material within time component/ season. The advantage of using expert model is:

  • the base for planning process which could be display by gannt and connected to calendar
  • the base for investments analysis  with cost needed due to time component ( how much money do we need to start producing)
  • the base for tracking of resource occupancy (which resources: Self-propelled, implements, workers do we need to start producing). 
  • the base for tracking of material occupancy (which materials do we need to start producing and their quantities)

Technically our expert model recipe could be "transferred" into different planning levels: within PLAN mask or within WORK ORDER mask.

DEVELOPMENT NOTE:

- in further development expert models will be connected to Nutrition features, irrigation modul, Fertilization modul.

 

 

 

 

 

 

 

 

2 DETERMINATION OF EXPERT MODELS VERSION MAIN SEASONAL CHARACTERISTICS

Expert model 0 version (expert model imported through WEB service)

Red colored expert model version are expert models version which were imported through Web service (Administration panel/ Settings/Program parameter/Farming/Agronomy/Expert models/tab Expert models. Red colored expert model version is always 0 version and locked for editing. All task and resources which are determined within expert model imported through web service are displayed. By clicking on Copy button a copy of red colored expert models version display as a version 1. Version 1 could be changed and adjust according to individual requirements.

 

 

 

 

Determination of main seasonal characteristics

Main characteristics of expert model version are entered within expert model descriptions. Expected yield characteristics are calculated according to surface unit hectare (10.000 m2).

 

 


 

 

Task From drop-down menu select task, enable to create a new task with Items by double click a) Task items settings needed
Name Task Name is displayed automatically  
Task Date calendar selection for task   
Delay in days (day) automatically calculation of expert model version duration, calculated on the base of first Task Date ( as a Duration in day from first till last task); for first task automatically entry of 0 Delay  
Needed Time (h/ha) Estimation of hours needed for task realization (per hectare)  
U/M Unit for needed time ( in hours), automatically entered  
Fuel (l) Estimates of fuel consumption per hectare  
Phenological Phase Select the phenological phase for task; additional settings must be done b) Phenology settings
Reason For individual task a reason for task realization could be entered, usually a reason to prevent disease/pest/ weed spreading  
Note entering notes possible  

a) Item setting for task

Minimal requirements for entering task within items are definition of Primary Category,  Item type, VAT, base for  Salary calculation.

b) Phenology settings

In order to select the phenology stage from-drown menu some setting within Administration panel/ Settings/Program parameter/Farming/Agronomy/Phenology/ tab Group to phenology  must be preset.

Till now no connection of attribute Delay is set (idea is to connect estimated  Delay in days for phenostage and incorporate it into planning process and calendar; in further DEV plann).

Stage ID BBCH Phenological stages
Image in case Phenostage posses an image it is displayed
Stage description Automatically entered phenostage description
Delay Manually entering of estimated Delay in days for individual phenostage due to sowing task
Note entering notes possible

 

Tools Copy/Insert/Move to edit tasks (funtionality is disabled from Release 10.00.5.00; it will be upgraded/re-developed in further DEV)

By right click on task  a window with three menus displays:

COPY TASK: 

a) Want to copy task FERTILIZATION (with position number 80) before task HARROWING ( with position number 40). 

b) Result: FERTILIZATION  is copied ( with all included attributes)  before task HARROWING. Task harrowing gets new position 60, sowing 80, fertilization 100.  Attributes of copied task  can be manually  changed according to new position: attributes Delay in days, Needed time for ha, fuel, phenological phase and others. In case bellow ( a Delay in day  by Fertilization will be manualy corected to 0 or 1 ( in case Fertilization is first task =on day 0 or secound task ( one dy later).

 

INSERT NEW TASK:

a) want to insert task LIMING  before task HARROWING ( with position 60). within drop-down menu all task are displayed which are recorder within Idents as as primary category Agrowork and Item Type 911.  

b) Result: new task LIMING is inserted before task HARROWING; inserted task LIMING gets new position number 60, all tasks position numbers are changed for +20 ( harrowing have 80, sowing 100, fertilization 120); attribute delay in days is automatically created as previous task Delay in Days (ploughing), all other attributes have value 0. All atributes could be manually changed. 

 

MOVE TASK:

a) Want to move task SOWING ( with position number 120) to position 40 ( while we wanted to plan task sowing after ploughing=after porition 20.)

 

b) Result: task SOWING is moved from position 120 to position 40 - after plouging. Task SOWING gets position number 40, for all followed task  position task is changed for range +20. Preset attributes within moved task stayed unchanged and can be manually change ( especialyy delay in day must be defined according to new positions).


4. SELECTING OF RESOURCES

Selecting of Material

Selecting of material for previously (above) selected task.

Material From drop-down select the  Idents of material  
Name Name of Material as a description, it is se automatically  
Qty Enter the quantity of material ; value per hectare  
U/M unit of material; it is set automatically as it is preset within Idents  
Note entering notes possible  

Selecting of Self-propelled

Selecting of self-propelled for previously (above) selected task.

Type  From drop-down select the self-propelled resource type group c) resource type group 
Resource From drop-down menu select individual resource within resource group d) resource settings
Name Name of individual resource is entered automatically by saving the record  
Qty Quantity of resource; it is set automatically as a 1 piece  

 

c) Self-propelled resource type group displayed:

In order to select the resource group of self-propelled the settings of resource group have to be preset within Financials/ Fixed assets.

Example: for self-propelled tractor a group of SPTRACTR and a subtype Equipment settings are needed.

d) Resource individual settings:

In order to select individual self-propelled from drop-down the settings of individual self-propelled have to be preset within Agriculture holding/Agriculture machinery and equipment/ tab Main resource.

Example: for tractor Fendt 600 a group (ID)  TRC as settings is needed.

NOTE: 

000001.gif

Resource  as Self-propelled and Attachment could be selected  or by a) selecting resource group first or b) selecting individual Resource direct ( without selecting resource group type; in this case a Resource group type will be added after saving record automatically.

 

Selecting of Attachment

Selecting of attachment for previously (above) selected task

Type  From drop-down select the attachment resources type group e) resource type group
Resource From drop-down menu select individual resource within attachment resource type group f) resource settings
Name Name of individual resource is entered automatically by saving the record  
SP From drop down a selection of previously entered Self-propelled is possible in order to link attachment to Self-proeplled.   
SP name in case of self-propelled is selected a self-propelled name is entered automatically.  
Qty Quantity of resource; it is set automatically as a 1 piece  

e) Attachment resources type group

In order to select the resource group of attachments the settings of resource group have to be preset within Financials/ Fixed assets. For example: for attachments group Ploughs a group of ATPLOUGHS and a subtype Equipment settings are needed.

f) Individual resource settings

In order to select individual attachment from drop-down the settings of individual attachment have to be preset within Agriculture holding/Agriculture machinery and equipment/ tab Main resource. For example: for  PLW 10 (individual plough)  a group (ID)  PLG  as settings is needed.

Selecting of Worker

Selecting a labour for previously (above) selected task.

Type A resource group of Labour is preset automatically  
Worker Selection of individual worker from drop-down menu; usually entering only of Resource type Labour g) worker settings
Name Name of individual worker is entered automatically by saving the record  
Hours manualy entering of hours , estimated for task:  In case when more workers are assigned to task  a value of hours for task has to be multiply ( e.c. for task there is a estimation of 3 hours for realization per hectare, if 2 workers have to be involved then Labour hours are 6 hours)  ( parameter will be connected to planning process)
U/M unite of measure ( hours)  
SP From drop down a selection of previously entered Self-propelled is possible in order to link attachment to Self-proeplled.   
SP name in case of self-propelled is selected a self-propelled name is entered automatically.  
Additional task  In case worker can realize additional task during operating main task process in columns of additional task/ additional article this data are recorded (e.c. sorting the potato as a main task and cutting the potato seed material). (parameter will be linked to planning process/ to WO, in furhrer DEV plann)
Additional article In case any additional material is used by additional task this could be entered here  
Expected Production   (parameter will be linked to planning process/to WO; in furher DEV plann).
U/M unit of measure  
Note entering notes possible


 

  

     


Rate this topic
Was this topic usefull?
Comments
Comment will also bo visible in forum!