Task input
Task input menu is within CROPS&VEGS:

User interface (UI) for Task input is presented by 2 parts:
1. navigator row ( in progress)
2. entering row/grid

ENTERING PROCESS
By this a simply data entry is enabled: selecting date, ident, work order, Crop area, Resources ( Self-propelled& Implements), Worker. When tasks is classified as Harvesting also Product data could be entered.
GENERAL |
|
Date input |
Select date of realization by drop-down calendar
|
Ident |
Select Ident/Product which is monitored within Idents as a primary category CROP |
Word oder |
Selection of word orders, which are already created within CROP&VEGS work order, is enabled
|
No |
Selection of position of work orders, which are already planned on worker, is enabled |
Task |
Task Name is displayed automatically after selection of position line. |
AREA |
|
CA |
by selecting work order, Crop area is already entered (read-only) |
Plan |
Crop area size, which was planned for this task is already entered (read-only) |
Done |
Data about already Done Share of Crop area is presented, if existed (read-only) |
QTY |
Enter Area size, which was cultivated/used within this task ( obligatory entry) |
U/M |
Unit of measure ( usually hectares) |
RESOURCES |
|
Self-propelled |
If there is any self-propelled planned on selected task it is displayed, otherwise a selection from drop-down for all self-propelled, recorded within Agriculture holding/Agriculture machinery/tab Self-propelled is enabled. |
Implements |
If there is implements planned on selected task it is displayed, otherwise a selection from drop-down for all implements recorded within agriculture holding/ agriculture machinery/tab Implements is enabled. |
MATERIAL |
|
Material |
if there is any material planned on selected task it is displayed, otherwise a selection from drop-down for all materials, recorded within Items is enabled. |
Warehouse |
Select/Assign warehouse for used material |
Plan |
If there is planned QTY for selected material it is displayed ( read- only) |
Used |
Data about already Used Material within selected Task ( read-only) |
QTY |
Enter QTY of realized Material |
U/M |
Unit of measure for material |
WORK |
|
Worker |
if there is any worker planned on selected task it is displayed, otherwise a selection form drop-down for all workers, recorded within Workers is enabled. |
Plan |
if there is any planned hours for selected worker it is displayed (read-only) |
Done |
if there is any data about already done work (in hours) for selected task it is displayed (read- only) |
Start |
Entry field for starting time (obligatory field) |
End |
Entry field for ending time ( obligatory field) |
Time |
Calculative field presenting Done Time QTY |
U/M |
Unit od measure (usually hours) |
If selected task is type HARVESTING, there is another part for entering Product data:
PRODUCT |
|
Warehouse |
Selection of warehouse from drop-down to which Product will be assigned.
|
Plan |
If there is any data about planned product QTY it is displayed ( read-only) |
Harvested |
Data about already harvested Product within task harvesting ( read-only)
|
QTY |
Entry field for QTY of harvested yield |
U/M |
Unit of measure (as it is defined by ident) |
CONFIRMING PROCESS
After entering all data about realization a check books for selection (in the begining of row) need to be selected and followed by click on Confirm button.

a