Comparison of "old" Crop (menu Production cycles, Tasks) and "new" Crop (CROP planning forms)
1 Comparison of Production cycles with Work orders
Converting process rules:
a) Data recorded within PRODUCTION CYCLES are transformed into WORK ORDERS form. Individual work order represents individual crop area which was recorded within Production cycle as Crop area (previous as Subdivision).
b) Number of created work orders is equal to the number of previous assigned crop areas within Production cycles for which was reported realization. If the crop area was planned in Production cycle, but no work was reported on it through agriculture task menus, no Work is created.


Picture 3: Product Winter barley as production cycle Winter barley 2015 with assigned crop area Subdivision 541779_1 (above, old CROP) converted into work order Winter barley on Crop area Subdivision 541779_1 (below, new CROP)


Picture 4: Two Crop areas, assigned to product Wheat within production cycle Wheat 2013 (above, old CROP) converted into two work orders for Wheat, with related Crop Area (below, new CROP)
2 Comparison of Farming task with Work order
Converting process rules:
a) Form Farming task is replaced by tree main entry forms:
- Right-click entry on individual work order´s position within Work order
- Task input and Planned task input within CROP&VEGs menu
- Input Daily work within Tools/Daily plan
b) Data recorded within Farming task are displayed within individual Work orders - all data recorded for individual crop area within tab Sowing/fertilization/Protection/Care and Cultivation/ PRM Care and Cultivation/ PRM Mechanical tasks/ Other tasks/Moving/Grazing/ Product/ are displayed within individual work order as a position of work order.