Plan order tab
Here we can overview whole production plan for Crop areas we have created. To see how to assign EM`s to particular Field -> CA, click here: Assign Crop to CA. When we connect Expert model version with Crop area, we get all information that are important in this tab.
Plan order hierarchy:
1 Plan order: each record is result of drag-drop od Expert model version to individual crop area
1.1 Tasks: for each plan order positions as tasks are recorded -
1.1.1 Resource hierarchy: for each task adding of Machinery and Worker and Material is enabled

1. Plan orders
Line |
Sequential position number. |
EM |
The name of Expert model (Item) |
Version Name |
The name, description of Expert model. |
Version |
Version of expert model. |
Crop Type |
Data if Crop is Main or Catch = Additional crop (additional crop, produced after main crop in the same season);
If recorded within expert model version it is displayed automatically. |
Plan Total |
Total plan of production. Calculated from Crop area size and expected Yield middle value, as recorded in EM version.
Expected CA area is 20 ha
Middle value on Expert model for chosen version is 35.000 kg
20 ha x 35.000 kg = 700.000 kg
|
Plan /ha |
This data is recorded as middle value in expert model version. |
U/M |
U/M that is set on Item. |
Start Time |
The Start date of first task on chosen version of expert model. |
End Time |
The End date of ending of last recorded task task of expert model version. |
CA Name |
The name of crop area as set within Agricultural Holding - Fields tab Crop Areas. |
CA Area |
The size of crop area in hectares. If notes are recorded within expert model version it is displayed here. |
Note |
Here we can put some notes. |
WO |
Work order could be created from Plan order. In this case Work order ID is displayed here and
meanwhile Plan order becomes read-only grid. Creating Work order form plan is described within
Creating WO |
2. Tasks
Entering of sequential task as a Line/position of individual plan order is presented.
Line |
Task position, entered automatically as a sequential task. Displayed according to Expert model
Version positions. Line step defined in Agriculture panel / Manufacturing / Specs |
Task |
Automatically displayed as set in expert model version. |
Name |
Task Name is entered automatically |
Version |
Version of expert model. |
Time /ha |
Automatically displayed of needed time for operating task per hectare (in hours) as set within EM version; can be changed. |
Plan Time QTY |
Automatically calculated from Time/ha multiplied with Crop area size.
|
U/M |
Unit of measure |
Scheduled Start |
Plan start date displayed as set in expert model version. Can be changed.
Plan start hour displayed as set in Agriculture panel / Settings / Agronomy / Planning / tab Worker: general resource settings. Can be changed. |
Scheduled End |
Automatically calculated according to Planned Start date and Crop area size |
Phenology |
Select phenology stage from drop-down menu.
If recorded in EM version it is displayed automatically |