Plan order tab
Here we can overview whole production plan for Crop areas we have created. To see how to assign EM`s to particular Field -> CA, click here: Assign Crop to CA. When we connect Expert model version with Crop area, we get all information that are important in this tab.
Plan order hierarchy:
1 Plan order: each record is result of drag-drop od Expert model version to individual crop area
1.1 Tasks: for each plan order positions as tasks are recorded -
1.1.1 Resource hierarchy: for each task adding of Machinery and Worker and Material is enabled

1. Plan orders
Line |
Sequential position number. |
EM |
The name of Expert model (Item) |
Version Name |
The name, description of Expert model. |
Version |
Version of expert model. |
Crop Type |
Data if Crop is Main or Catch = Additional crop (additional crop, produced after main crop in the same season);
If recorded within expert model version it is displayed automatically. |
Plan Total |
Total plan of production. Calculated from Crop area size and expected Yield middle value, as recorded in EM version.
Expected CA area is 20 ha
Middle value on Expert model for chosen version is 35.000 kg
20 ha x 35.000 kg = 700.000 kg
|
Plan /ha |
This data is recorded as middle value in expert model version. |
U/M |
U/M that is set on Item. |
Start Time |
The Start date of first task on chosen version of expert model. |
End Time |
The End date of ending of last recorded task task of expert model version. |
CA Name |
The name of crop area as set within Agricultural Holding - Fields tab Crop Areas. |
CA Area |
The size of crop area in hectares. If notes are recorded within expert model version it is displayed here. |
Note |
Here we can put some notes. |
WO |
Work order could be created from Plan order. In this case Work order ID is displayed here and
meanwhile Plan order becomes read-only grid. Creating Work order form plan is described within
Creating WO |
2. Tasks
Entering of sequential task as a Line/position of individual plan order is presented.
Line |
Task position, entered automatically as a sequential task. Displayed according to Expert model
Version positions. Line step defined in Agriculture panel / Manufacturing / Specs |
Task |
Automatically displayed as set in expert model version. |
Name |
Task Name is entered automatically |
Version |
Version of expert model. |
Time /ha |
Automatically displayed of needed time for operating task per hectare (in hours) as set within EM version; can be changed. |
Plan Time QTY |
Automatically calculated from Time/ha multiplied with Crop area size.
|
U/M |
Unit of measure |
Scheduled Start |
Plan start date displayed as set in expert model version. Can be changed.
Plan start hour displayed as set in Agriculture panel / Settings / Agronomy / Planning / tab Worker: general resource settings. Can be changed. |
Scheduled End |
Automatically calculated according to Planned Start date and Crop area size |
Phenology |
Select phenology stage from drop-down menu.
If recorded in EM version it is displayed automatically |
Reason – manually written reason, usually a reason to prevent disease/pest/weed spreading; if recorded in expert model version it is displayed automatically
Earliest start time – data needed for Resource occupancy calculation (not connected to planning forms yet, stated April 2018).
Latest end time – data needed for Resource occupancy calculation (not connected to planning forms yet, stated April 2018).
Fixed Resource – data needed for Resource occupancy calculation (not connected to planning forms yet, stated April 2018).
Fixed Time – data needed for Resource occupancy calculation (not connected to planning forms yet, stated April 2018).
Notes – In case note was recorded within expert model or Plan UI it is already displayed (bolded)
Task editing rules:
- adding task could be done by:
a) inserting task by already written Line/position` s number (saving inserted record results in renumbering of all followed Lines/positions)
b) inserting task by new Line/position` s number ( saving inserted record results in display of last line/position` s number
c) adding task as a last positions
- deleting lines/positions results in no changing of line/position`s number
3. Adding material, Machinery and Workers
Selecting of self-propelled for previously (above) selected task could be done by drag&drop of individual self-propelled from code books (right-located) directly into Self-propelled grid. When Resource type is already set (from expert model) click on resource type code books opens only resources with selected Resource type.



Res. Group |
From drop-down select Resource group ( groups of self-proeplled as defined in Agriculture panel / Settings / Agronomy / Planning / Resource group. Currently no links between Resource groups and Planning forms
|
Type |
Select resource type. Automatically displayed if recorded in EM version |
Self-propelled |
Entered automatically when individual Self-propelled is added by drag-drop;
Empty data when only resource type is selected.
|
Name |
Entered automatically when:
a) selection of Resource type,
b) drag-drop of individual Self-propelled |
Plan Area (ha) |
Crop area size which is planned to be cultivated by individual Resource
|
Plan Time Qty |
Quantity of resource; it is set calculated automatically as product of fulfilled value Time needed/ha (in hours) within task and plan Area. |
Scheduled Start Date |
Automatically displayed from scheduled start date/time of related task; can be changed manually. |
Scheduled end date- Automatically calculated according to Scheduled start date/time & plan time QTY; can be changed.
Note – possible to add notes