Change plan order
Change plan order
Planning of Crops (for example into crop-rotation) could be done in 5 years in advance with some general plants, while before production season starts this crop could be replaced with Variety/hibrid, exceptionally also with another crop.
Changing of plan order is enabled in order to replace existing crop with another crop or variety on related Crop area:
- by right - click in grid:

- right - click on gantt event:

Change plan order rules:
- no Changing enabled when work order is already assigned to plan order

- no Chaning enabled when individiual resource is assigned to any of task/position within plan order

After selecting Change plan order a unique window as Assign Crop to Crop area displays, with some different funcionalities:

Crop |
This Field is automatically added (as a result of drag-drop), when we choose which EM will be on CA. It is possible to change CROP with all Expert models/Idents with determined primary category as CROP ( within modul CROPs&VEGs) or as GRS ( within modul GRASS). |
EM Version |
Select of expert model version: double click on it results in opening Expert model form |
Date to Select |
There are two options:
- From expert model: in this case DATEs are automatically changed according to expert model version, while YEAR is not changed
- Selected date: automatically displayed from origin plan order.
|
Start Date |
The start date of first task on Expert model version |
Year |
This data we chose manually; automatically reads year of drag&drop |
End Date |
The finish date of the last task on Expert model; automatically recalculated by changing plan order |
CA |
Read- only data about Crop area ID |
Size |
Read- only data abou Crop area size |