TASKS part with sequential task
Tasks
Entering of sequential task for selected work order is presented.
ENTERING TASK BY CREATING WORK ORDER WITHOUT EXPERT MODEL VERSION:

| Line |
Task position, entered automatically as a sequential task |
| Task |
From drop-down menu you select task:
Text color due to tast status:
- blue - partly done task, some of planned ares was not reported as done
- red - task finished, all planned area was reported as finished.
|
| Name |
Task Name is entered automatically |
| Time/ha |
Manual entering of needed time for operating task per unit (per hectare) |
| Plan Time QTY |
Automatically calculation of Time/ha regards CA area |
| U/M |
Unit of measure |
| Scheduled start |
Default start date as curent day as Planned start Date; change possible. Default Time derives from Settings.
|
| Scheduled end |
Automatically calculated regards previously Planned Start |
| Phenological phase |
Select Phophase from drop-down |
| Reason |
Type additional text for task |
| Fertilization type |
Select fertilizattion type for Nutrition plan |
| Note |
Enter Note |
ENTERING TASK BY CREATING WORK ORDER WITH EXPERT MODEL VERSION:
Tasks for selected expert model are displayed automatically and copied from expert model version; all fields could be edited.

| Line |
Task position, entered automatically as a sequential task |
| Task |
From drop-down menu you select task |
| Name |
Task Name is entered automatically |
| Time/ha |
Manual entering of needed time for operating task per unit (per hectare) |
| Plan Time QTY |
Automatically calculated of Time/ha regards CA area |
| U/M |
Unit of measure |
| Scheduled start |
Automatically transferred from expert model version. |
| Scheduled end |
Automatically calculation regards previously Planned Start and CA Area size data. |
| Note |
In case note was recorded within expert model it is already displayed (bolded) |
By entering Scheduled start date a control for crop area validity is displayed: