Quantity and Value Check
Quantity and Value Check
Quantity and Value
Check
 |
Select Quantity and Value Check report in Manufacturing Analysis and click Report (or double-click the report) in order to display it according to the set
criteria.
Report includes data about actual material consumption and work completed as offset from the planned.
Specific lines of materials and operations on work orders are displayed for each work order separately.

The following data are displayed in the report header:
Report generated |
The date and time when a report was generated are displayed in the header.
|
Document Type
|
ID and name of document type appear in the header.
|
Report Name
|
Report name as set in Document Types settings - in this case Quantity and Value Check - appears here.
|
Work Order |
Displays an ID of work order.
|
Product
|
Displays an ID and name of product in production.
|
Finished
|
Displays how far into the finish stage is work order (expressed in percentage) if comparing the produced/transferred quantity against the planned one.
|
Status
|
Displays a wok order status.
|

Specific Data Related to Issued Lines:
Line |
Displays a line of item on work order.
|
Item
|
Displays an ID of material (assembly material line) which is issued to work order. |
Description
|
Displays a name of material or operation being issued to work order. |
Planned
|
Displays a quantity in line for issue to work order. |
Used
|
Displays a quantity issued to work order. |
Neg. Offset % |
Displays a negative offset in percentage. Here it is calculated whether the actual consumption is less than the planned one: 100-(100*Used/Planned). |
pos. offset %
|
Displays a positive offset in percentage. Here it is calculated whether the actual consumption is greater than the planned one: (100*Used/Planned)-100. |
Value - Expected |
Displays a quantity in line for issue to work order. To calculate planned value make use of the valuation price for material consumption (operations) which you would use in issuing to WO. |
Value - Used |
Displays a quantity issued to work order. |
Neg. Offset % |
Displays a negative offset in percentage. Here it is calculated whether the actual consumption is less than the planned one: 100-(100*Used/Planned). |
pos. offset % |
Displays a positive offset in percentage. Here it is calculated whether the actual consumption is greater than the planned one: (100*Used/Planned)-100. |
Percentage of offset quantities and values is not calculated where planned quantity equals 0.