PANTHEON™ Help

 Toc
 PANTHEON Help - Welcome
[Collapse]PANTHEON
 [Collapse]Guides for PANTHEON
  [Collapse]Guide for PANTHEON
   [Expand]Settings
   [Expand]Orders
   [Expand]Goods
   [Collapse]Manufacturing
    [Expand]Manufacturing Scheduling (MF)
    [Collapse]Simple Manufacturing
     [Expand]Work Orders
     [Expand]Cost Analysis
     [Expand]Work Order Reports
     [Expand]Norm Attainment
      Issue Overview
      Manufactured Products Overview (Serial Numbers)
     [Expand]Re-export
      Work Order Processing
      Relieving Inventory
      Creating Work Orders
      Cost Price Calculation in Work Orders
     [Collapse]Examples
      [Collapse]Dismantling of products
        Settings
        Specification
        Production
       Shrinkage - Introduction
       Material Shrinkage - GROSS
       Material Shrinkage - NET
       Product Shrinkage - NET
       Product Shrinkage - GROSS
       Manufacturing Using Multi-Level Specification
       Processing Service Work Order - Type U
       Work Order for Product with Checked Serial Number Tracking
       Formulas Used in Evaluation of Internal Receiving and Issues - WO
       Manufacturing and Integrated Standardized Service
      [Expand]Sub-contracting
      [Expand]Simple Manufacturing
    [Expand]MT Manufacturing
    [Expand]ZEUS production cube
   [Expand]POS
   [Expand]Service
   [Expand]Financials
   [Expand]Personnel
   [Expand]Analytics
   [Expand]Desktop
   [Expand]Help
   [Expand]Messages and Warnings
   [Expand]Additional programs
  [Expand]Guide for PANTHEON Retail
  [Expand]Guide for PANTHEON Vet
  [Expand]Guide for PANTHEON Farming
 [Collapse]User Manuals for PANTHEON
  [Expand]User Manual for PANTHEON
  [Expand]User Manual for PANTHEON Retail
  [Expand]User manual for PANTHEON Vet
  [Expand]User Manual for PANTHEON Farming
[Collapse]PANTHEON Web
 [Collapse]Guides for PANTHEON Web
  [Expand]Guide for PANTHEON Web Light
  [Expand]Guide for PANTHEON Web Terminal
  [Expand]Guide for PANTHEON Web Legal
 [Collapse]User Manuals for PANTHEON Web
  [Expand]Getting started PANTHEON Web
  [Expand]User Manual for PANTHEON Web Light
  [Expand]User Manual for PANTHEON Web Terminal
  [Expand]User Manual for PANTHEON Web Legal
[Collapse]PANTHEON Granules
 [Collapse]Guides for PANTHEON Granules
  [Expand]Personnel Granule
  [Expand]Travel Orders Granule
  [Expand]Documents and Tasks Granule
  [Expand]Dashboard Granule
  [Expand]B2B Orders Granule
  [Expand]Field Service Granule
  [Expand]Fixed Assets Inventory Granule
  [Expand]Warehouse Inventory Granule
 [Collapse]User Manuals for PANTHEON Granules
  [Expand]Getting started
  [Expand]Personnel Granule
  [Expand]Travel Orders Granule
  [Expand]Documents and Tasks Granule
  [Expand]B2B Orders Granule
  [Expand]Dashboard Granule
  [Expand]Field Service Granule
  [Expand]Fixed Assets Inventory Granule
  [Expand]Warehouse Inventory Granule
[Expand]User Site

Load Time: 1640.651 ms
"
  1000709 | 200745 | 342804 | Updated
Label

Izdelava

Production

In this section is described process of producing Work Order for product dismantling.

 

-        In grid a new column Percentage is added, which can be updated. This column is visible only on Work Order that have selected in document type                          settings - Work order type - Dismantling.

-       Functions in wizards Confirm Issue and Confirm Receving are disabled as for Service Work Order.

-       Partial production is possible, when produced quantity is equal or bigger than planned then work order is closed.

 

 

Linked Documents

 

 

On tab Liked documents, on Work order, a new tab "Receving of By-Products" is added. In this tab you can edit date and Quantity of document.

 

 

 

For positions with negative norm, after confirmation of production, an internal document of receiving, defined in document type settings for each item type, is created. if item is managed by serial number, a window for entering serial numbers is opened, whe negative issue is made. When Issue is made then a window fo issuing serial numbers is opened.

      

Own Price Calculation

When calculating own price all issues of materials and labor is taken in account. Based on this issues we get cost value for specific Work Order. In next step we collect data from receiving of by product group by receiver (warehouse), item, percentage and linked type. For each receiving of by-products is checked whether a Formula for calculating price is set, if it is then a price is calculated based on this formula. Otherwise own price is calculated so that Sum value of issue is multiplied by percentage and divided by receiving quantity.

For example:   Log price is100€, cost of sawing 2x10€; Sum of costs are 120€. This base is divided according to preset percentages on each derived product.

   

Item Percentage Share amount Quantity Price/Pcs
Board A 50 % 60 € 10 6 €
Board B 30 % 36 € 15 2,4 €
Board C 20 % 24 € 5 4,8€

     

Refresh Stock

Refresh stock gathers all issues for a work order and then calculate price for each receiving based on preset percentage of derived product. If for particular type of item a formula is set then, then price is calculated by it. This type of calculating price is done for Work orders that have linked by-products receiving and work order is a type - R -> Dismantling.

 

 

Rate this topic
Was this topic usefull?
Comments
Comment will also bo visible in forum!