Adding Components
Adding Components
Selecting the Add tab in the Change Components and Resources window displays following criteria.

Product Criteria
Criteria for a Component Being Added:
Having entered a component additional fields appear according to item type:
Type S or U – Operation:

Tpr |
Enter production time required for assembly. |
Tsu |
Enter set-up time required for production of specified quantities expressed in the selected U/M - assembly series. It handles of fixed production time required for preparation of resources in series production. |
U/M: |
Enter or select a time unit in which to express production time. |
Batch |
Displays number of units in batch (number of units of measurement, charge, the minimum required production amount - actual production amount must be its multiplier). You can modify if required. |
Volume |
Enter or select number of units in assembly for which production time was set ranging from 1 to 1,000,000 units. That is, if you select 1,000 units, the production time is expressed for production of 1000 units. Here is by default displayed volume in operations as set in program parameters of Administration Panel. |
(U/M) |
Enter or select a time unit in which to express production time. Select it according to the specification's settings. |
Quantity |
Enter quantity expressed in unit of measurement for external operations.
|
Volume |
Enter or select a unit of production. The field is visible with operation of external type. |
U/M |
Enter or select a unit of measurement. The field is visible with operation of external type. |
Operation Type |
Enter or select a type of operation: Work Operation which is intended for specifying regular operations; Fictional Operation which is intended for specifying any optional information regarding work and control operations; Control Operation which is intended for checking quality control; External Operation which is intended for specifying operations that are outsourced to external subcontacting entities. |
Offset Type |
Enter or select a type of offset (between previous operation and the one in question) in workflow sequence: Simultaneously to previous - an operation type defining the sequence between the previous and the operation in question; After previous has finished - an operation type carried out after the previous has finished; Time offset - an operation type carried out after you enter working hours in the field appearing after having selected this option. That is, Tpr of the previous operation must be less or equal to the Tpr of the operation in question; Quantity Offset - Basically the same as with Time offset option the only difference being that time offset per product quantity is considered for previous operation (offset = quantity × Tpr previous). |
(Time Offset/quantity) |
An optional field appears after having selected time or quantity offset type. Enter the appropriate amounts. |
Resource |
Set a production resource for operation. Enter or select it from available criteria such as ID, type, name or parent resource ID. |
No. of Workers |
Optional field: When executing an operation select number of resoruces in order to calculate production costs. |
Salary Grade |
Optional field: When executing an operation select a salary grade for employees to be able to calculate production costs. |
Bonus |
Optional field: When executing an operation, select a bonus in order to calculate production costs. |
Not S or U Type – Material:

Quantity |
Enter quantity in specification. It is expressed in the primary unit of measurement. |
Volume |
Enter or select number of units ranging from 1 to 1,000,000 units. The volume of materials, as set in Program Parameters in Administration Panel, is set by default. |
Batch |
Displays number of units in batch (number of units of measurement, charge, the minimum required production amount - actual production amount must be its multiplier). You can modify if required. The required production amount is given for batch specific U/M (number). |
U/M |
Enter or select a unit of measurement used with item. The lookup table includes units of measurement as defined in the Items register: That is, primary U/M which is the main unit, secondary U/M that can be set by the collective U/M and customs U/M which is tertiary. |
Srap % |
Enter scrap in % value of the entire quantity required. It is visible if you previously set it in Administration Panel. |
Waste % |
Enter waste in % value of the entire quantity required. It is only visible if you set it in Administration Panel. |
Clicking Refresh generates available data displaying them in Add Components and Resources panel in the bottom. Collapse or display the panel by clicking the icon.
Here are listed other items already included in the specification.

Sel. |
If checked, it marks a line to be added. Otherwise not. Check it by double-clicking the box. You can also use the right-click menu:

|
Product |
Displays an ID of product to add a component. |
Product Name |
Displays a name of the product. |
Prod. Item Type |
Displays an item type. |
Prod. Prim. Cat. |
Displays a primary category ID. |
Prod. Sec. Cat. |
Displays a secondary category ID. |
This is followed by columns offering data which vary according to the selected item type:
Type S or U – Operation:
Component ID |
Displays an ID of component to be added. |
Component Desc. |
Displays a name of the component. |
Line |
Displays a line number used containing an item from the selected specification. |
Alt. |
Displays an alternate containing an item from the selected specification. |
U/M |
Displays a unit of measurement (U/M) used. |
Volume |
Displays number of units in specification expressed in U/M set. It can range from 1 to 1,000,000 units. |
Batch |
Displays number of units in production batch. |
Tpr/Volume |
Displays production time according to volume. |
Tsu/Volume |
Displays set-up time according to volume. |
Resource |
Displays a resource used in operation. |
No. of Workers |
Enter number of workplaces assigned for carrying out operation. |
Salary Grade |
Optional field: When executing an operation select a salary grade for employees to be able to calculate production costs. |
Offset |
Type of offset can be:
- Z - After previous has finished
- I - Simultaneously to previous
- C - Time offset
- K - Quantity offset
|
Type |
Displays type of operation:
- D - Work
- F - Fictional
- K - Control
- Z - External
|
Bonus |
Optional field: When executing an operation, select a bonus in order to calculate production costs. |
Not S or U Type – Material:

Component ID |
Displays an ID of component to be added. |
Component Desc. |
Displays a name of the component. |
Line |
Displays a line number containing an item from the selected specification. |
Alt. |
Displays an alternate containing an item from the selected specification. |
U/M |
Displays a unit of measurement (U/M) used. |
Volume |
Displays number of units in specification expressed in U/M set. It can range from 1 to 1,000,000 units. |
Batch |
Displays number of units in production batch. |
Quantity |
Displays norm in specification.
|
Net/Volume |
Displays net quantity required for assembly of batch quantities per volume. |
Scrap % |
Displays % of scrap in line of material.
|
Scrap/Volume |
Displays quantity of scrap in batch production according to volume. |
Waste % |
Displays % of waste in line of material.
|
Waste/Volume |
Displays quantity of waste in batch production according to volume. |
Gross/Volume |
Displays gross quantity required for assembly of batch quantities per volume. |
Click the Refresh button to display refreshed data. In addition, the Add button is displayed. Click it in order to add components appearing on list.
The following message is returned after the operation has finished:

Item |
Enter or select an ID of component to add. Before proceeding you must enter the field. Otherwise you receive a notification.

|
Name |
Enter or select name of the component. |
Alternate |
Set alternate for component:
- Active - Selecting this option you set active alternate. If all alternates are active, the one assigned the lowest number will be set.
- Custom - Selecting this option displays a field including a lookup table with alternates from 0 to 250.
|
Line |
Set a line containing the component:
-
Last - The number of line used is based on the last line of specification. It is then increased by a degree set in Administration Panel | Program Parameters | Specifications.
-
Custom - Selecting this option displays a field for entering line number. The entered line must be greater than 0 and lower or equivalent to 30,000. Othewise an error message is returned. When collecting data a check is run for number of line. In case that it already exists in the specification it will be increased by one (1) to the first available value.

|
Item |
Enter or select an item to add component. Make use of wildcard %. |
Name |
Enter or select a name of the item. |
Item Type |
Enter or select a corresponding item type. |
Prim. Cat. |
Set a primary category ID. |
Secondary Categ. |
Set a secondary category ID. |