Plan
Plan
Opens a window for creating specific types of plans by selecting an appropriate option in the Plan window of Plan menu. When opening the window a plan that was last processed is displayed.

You must first prepare a plan type based on a defined plan document type.
The name of the window in the title bar is equivalent to name of plan type, as defined in plan document type.
Having created a new plan (by clicking
and entering data in plan header), you have to confirm it (
) and then enter data in plan lines.
Enter lines of plan directly or by transferring them using action buttons dealt with in detail in the follow-up - in manufacturing, in sales orders, in some other plan or in material plan.
To do manage plan lines use navigation buttons the window
You can also enter plan lines by using Find Item command from the right-click menu or simply by using a shortcut Ctrl+F.
How to enter individual fields in plan lines and methods used for editing are dealt with in the follow-up.
Detailed treatment of the functions Calculate Start Time and Calculate End Time based on data entered in specifications can be found at the end of this topic. They can be called up from a right-click menu.
Taskbar in Plans:
 |
Irretrievably deletes a selected plan. |
 |
Copies contents of plan to a newly-created one.
. |
 |
Creates a report from plan contents, according to criteria set prior to trying to generate a plan. |
 |
Create Plan Lines from Orders |
Lines of sales orders that were selected according to set criteria are transferred to plan lines. |
Create Plan Lines from Manufacturing |
Data from manufacturing work orders that were selected according to set criteria are transferred to plan lines. |
Copy Plan Lines |
Opens a window for copying plan lines. |
Delete Plan Lines |
Opens a window for deleting plan lines. |
Create WO |
Opens a window for creating work orders from plan lines. |
Scheduling |
Opens Schedule Plan window allowing you to distribute material requirements by specific dates in detail. |
The following functions can only be observed when in Plan Spec panel: |
|
Edit Lines |
Inserts a line in specification and using it you can add operations to procedure. At the same time it is used for changing and deleting just like in creating product specifications. |
Rearrange Lines |
Rearranges material lines and operations just like in creating product specifications. |
Copy Specification |
Opens a window for copying specifications. |
Delete Specification |
Click it to delete a specification. Before deleting is actually performed you have to confirm the operation. By deleting a plan specification a direct link between a line in plan and its corresponding specification is reestablished. |
|
Main Section Offers the Following Fields for Creating a Plan:
Date |
Displays a date of plan. Typically it is the date on which the plan was created. By default it is the current data and you can also select it at will. |
Number |
Displays the number and name of the plan. It is generated automatically as a 5-digit plan prefix number. The first two digits mark a year and this is followed by a 3-diigit code for type of plan which is basically plan document type ID. Name is maximum 40 characters in length. |
Status |
Plan status can be either O - Open or C - Closed. By default it is set to O - Open. After the plan is no longer in use, that is, it is archived, you manually set status C - Closed. |
Period From |
Displays a start date from the selected plan period. |
To |
Displays an end date of the selected plan period. |
Clerk |
Select an employee ID responsible for a specific plan (person responsible). |
Customer |
Select a customer linked to the plan. |
Consignee |
Select a consignee linked to the plan. |
Department |
Select a department linked to the plan. |
Cost Center |
Select a cost center linked to the plan. |
Material Planning Complete: |
Displays date and time when the last material planning was generated.
|
Capacity Planning Complete: |
Displays date and time when the last capacity planning was generated.
|
Schedule Planning Complete: |
Displays date and time when the last schedule planning was generated.
|
Note |
Enter any text related to the plan. |
By clicking
you can hide a section of the panel.

 |
By clicking title of a field they are displayed in ascending order.
|
 |
The order in which columns are displayed can be rearranged by drag-and-drop method.
|
In the bottom section are displayed two tabs displaying the following data:
Plan Lines:

Line |
Display a consecutive number of plan line, You can change it at will. Double-clicking it displays data in Plan Spec panel. |
Regulation |
If checked, displays whether a line of plan is linked to a specification. It is refreshed whenever a plan specification is updated, deleted, copied... By double-clicking it opens Plan Spec panel. |
Has Spec? |
If checked, displays whether an item in line of plan is linked with product specification. |
Item |
Enter or select ID of item in line of plan. Double-clicking the ID opens item's product specification, if it handles of an item of type P,C or U. In the opposite case opens the Items register. |
|
Priority |
Enter or select Priority |
Name |
Enter or select a name of item. |
Alt. |
Displays alternate item's ID¸. You can select among item alternates manufactured using a product specification from a selection table. |
Quantity |
Displays item quantity in a line. You can change it, by inserting value in tab Product Waste/Scrap. |
Scrap |
Displays a planned quantity of scrap in a line of plan. You can change it, by inserting value in tab Product Waste/Scrap. |
Waste |
Displays a planned quantity of waste in a line of plan. You can change it. |
U/M |
The unit of measurement used with item quantity. |
Start Date |
Select a planned start date of manufacturing. It can also display a start date calculated on the grounds of a defined end date (deadline) from specification. When entered manually the time (hours, minutes) is entered after having selected a date.
Start date also gets entered by transferring from manufacturing to plan as well as in copying plan. |
End Date |
Select a planned end date of manufacturing. It can also display a start date calculated on the grounds of a defined start date (deadline) from specification. When entered manually the time (hours, minutes) is entered after having selected a date.
End date also gets entered by transferring from sales orders to plan, from manufacturing to plan and material plan to plan as well as in copying plan. |
Doc. Type |
Select a manufacturing (work order) document type. The default document type when creating lines of plan (or by transferring) is defined when you set item in Specification panel, that is, in document type settings when creating new items the Items panel.
You can change the second available document type in manufacturing. |
Order |
Sales order number will be transferred from linked sales orders when transferring from sales orders or from manufacturing. You can enter it manually or it can be changed at will. |
Order Item |
Line number of sales order will be transferred from linked sales orders when transferring from sales orders or from manufacturing. You can enter it manually or it can be changed at will. |
. . .and Its Continuation - after Scrolling Right

Date of Order |
Select a date of sales order which is the date on which it was created . It is transferred from linked sales orders when transferring from sales orders or from manufacturing. You can enter it manually and change it at will. |
Order Status |
Display order status if a line of plan was created on grounds of an order. |
Order Qty. |
Displays order quantity on grounds of which a line of plan was created. |
Order Dispatched |
Displays an already dispatched quantity in line of order. |
Order Open |
Displays quantity as of yet not dispatched: that is, the difference between the values in fields Order Quantity and Order Dispatched. |
Customer |
Select a customer that is transferred from linked sales orders when transferring from sales orders or from manufacturing. You can enter it manually or change it at will. After having selected it the Consignee is filled-in automatically. |
Consignee |
Select a customer that is transferrd from linked sales orders when transferring from sales orders or from manufacturing. You can enter it manually. After haviing selected a consignee Customer is filled-in automatically with data from the Subjects register. If payer has not been set, then the customer is equivalent to consignee. Here you have to take into account that the customer was not entered previously. |
Department |
Select adepartment from which a customer is transferred from linked sales orders when transferring from sales ordes or from manufacturing. You can enter it manually or change it at will. |
Note |
Enter any text to line in plan. Click to display the note and add anything to it. |
Cost Center |
Select a cost center in transfer of linked sales orders when transferring from sales order or from manufacturing. You can enter it manually or change it at will. |
WO |
Displays a number of linked work order. It is created when releasing WO from plan or when transferring lines in manufacturing plan. |
Merged |
If checked, it displays whether a work orderwas created when merging WOs. |
WO Status |
Dispalys a current status of the linked work order. |
WO Qty |
Displays a planned quantity of products in work order. |
WO Received |
Dispalys a received quantity transferred from work order. |
WO Open |
Displays unmanufactured quantity of products in work order. That is, the difference between a planned and received quantity. |
Item Type |
Displays an item ID. |
Prim. Category |
Displays an item's primary category. |
Sec. Category |
Displays an item's secondary category. |
The right-click menu offers you the following options (as described in the beginning).

Selecting appropriate option launches calculation of start and end dates in lines of plan. You can calculate dates after having entered a second one as well as manufacturing time and structures.
Shold a start date be given, the end date is calculated based on it so that manufacturing time is added to it where manufacturing time of operations as well as resource capacities are taken into account (just like they were totally available).
An end date is calculated in an analogous way.
In case start date is not given then a current date is set by default and end date is calculated based on it.
If the end date is not given, then a current date us et by default and end date is calculated based on it.
You have to confirm the operation by clicking Yes on a warning informing you that calculation of start dates can take some time depending on the size of plan and technological structures used. It is wise you run such processes when not processing anything else.

When entering plan period (start and end date of plan) a check is run which returns an error by incorrect entry. A check is run when having entere both dates.
On the other hand, a check is run when entering data in lines of plan, that is for start and end date. In case of an incorrectly entered date the above error is returned.