Specification Alternates
Specification Alternates
Select an Alternate on the specification tree to open a panel displaying alternates and selected type of scheduling.

Alternate can be added trought specification tree (right click on the mouse and select Add alternate) or on alternate form
.
Alternate can be deleted trought specification tree (right click on the mouse and select Delete) or on alternate form
.
You can show only active alternates or all alternates (right click on the mouse and enable Show all alternates) on Product specification – product level. By default only active alternates are shown.

Alternates filtering
To find the appropriate alternates, you can use Alternates search at the top of the product specification tree.

Here you can find the following data:
Alt. |
Displays an ID of specification's alternate. You can change it at will. |
Name of Alternate |
Displays a name of specification's alternate (you can enter it, if required). |
Active |
If checked, it displays that the alternate has been activated for use in planning and production. The latter can be set in the active alternate field in specification header. |
Status ID |
Enter or select a status of alternate. You can set statuses in Specification Statuses. |
Note |
Enter a note for Alternate |
Quantity/Day |
Enter quantity of standard daily output in production. Usually it is set according to the current work operation. Of course, the normal daily amount of work has to be taken into account. It is used for a more simplified scheduling of material requirements. That is, not like in technological procedures.
It is used only in case By Daily Quantities is set in the Scheduling Method box in Administration Panel | Program Parameters | Manufacturing | Scheduling. |
UM |
Displays a unit of measurement used with daily quantity. It is equivalent to U/M set in the Items register. |
Duration |
Enter duration for how long does it take to produce a product quantity when scheduled by daily quantities. It is possible to do this due to varying availability of resources (e.g. working in different shifts).
It is used only in case By Daily Quantities is set in the Scheduling Method box in Administration Panel | Program Parameters | Manufacturing | Scheduling. |
|
Below are examples of calculated schedules using the setting By Daily Quantites:
Quantity/Day |
Duration |
Product Quantity |
Time Required |
1,000 units |
8 hrs |
500 units |
4 hrs |
800 units |
16 hrs |
600 units |
12 hrs |
|
Duration U/M |
Enter or select a temporal U/M used in daily production. |
Scheduling Method |
Select a method used for scheduling. It can be determined in Scheduling Method in Administration Panel | Program Parameters | Manufacturing | Scheduling.
- No Scheduling - By using this option there is no scheduling of production.
- By Lead Times - Use it to consider set lead times in scheduling.
- By Daily Quantities - Use it to consider set duration in production of daily quantities in scheduling.
- By Technological Procedures- Use it to consider standard production time in operations of technological procedures in scheduling.
- By Formula for Technological Procedures - Use it to calculate production time according to a special formula as defined in Scheduling in Program Parameters.
|
Lead Time |
Enter lead time representing time required for production of the assembly. Usually it is set according to the current work operation. Of course, the normal daily amount of work has to be taken into account. It is used for most simplified scheduling of material requirements. That is, simpler than scheduling by daily quantities or technological procedures.
It is only used in case By Lead Times is set in the Scheduling Method box in Administration Panel | Program Parameters | Manufacturing | Scheduling. |
|
Below are examples of calculated schedules using the By Lead Times setting:
Lead Time |
Product Quantity |
Time Required |
1 day |
500 units |
1 day |
1 day |
600 units |
1 day |
|
Lead Time U/M |
Enter or select a temporal U/M for lead time. |
Work Op. |
If checked, the selected work operations are included in specification. |
Fictional Op. |
If checked, the selected fictional operations are included in specification. |
Ctrl. Op. |
If checked, the selected control operations are included in specification. |
External Op. |
If checked, the selected external operations are included in specification.
|
Work Process |
Enter or select a work process used in production.
|
Transfer S/N |