PANTHEON™ Help

 Toc
 PANTHEON Help - Welcome
[Collapse]PANTHEON
 [Collapse]Guides for PANTHEON
  [Expand]Guide for PANTHEON
  [Expand]Guide for PANTHEON Retail
  [Expand]Guide for PANTHEON Vet
  [Expand]Guide for PANTHEON Farming
 [Collapse]User Manuals for PANTHEON
  [Expand]User Manual for PANTHEON
  [Expand]User Manual for PANTHEON Retail
  [Expand]User manual for PANTHEON Vet
  [Expand]User Manual for PANTHEON Farming
[Collapse]PANTHEON Web
 [Collapse]Guides for PANTHEON Web
  [Expand]Guide for PANTHEON Web Light
  [Expand]Guide for PANTHEON Web Terminal
  [Expand]Guide for PANTHEON Web Legal
 [Collapse]User Manuals for PANTHEON Web
  [Expand]Getting started PANTHEON Web
  [Expand]User Manual for PANTHEON Web Light
  [Expand]User Manual for PANTHEON Web Terminal
  [Expand]User Manual for PANTHEON Web Legal
[Collapse]PANTHEON Granules
 [Collapse]Guides for PANTHEON Granules
  [Expand]Personnel Granule
  [Expand]Travel Orders Granule
  [Expand]Documents and Tasks Granule
  [Expand]Dashboard Granule
  [Expand]B2B Orders Granule
  [Expand]Field Service Granule
  [Expand]Fixed Assets Inventory Granule
  [Expand]Warehouse Inventory Granule
 [Collapse]User Manuals for PANTHEON Granules
  [Expand]Getting started
  [Expand]Personnel Granule
  [Expand]Travel Orders Granule
  [Expand]Documents and Tasks Granule
  [Expand]B2B Orders Granule
  [Expand]Dashboard Granule
  [Expand]Field Service Granule
  [Expand]Fixed Assets Inventory Granule
  [Expand]Warehouse Inventory Granule
[Expand]User Site

Load Time: 812.517 ms
"
  6613 | 1 | |
Label


The process of creating the Basic Timetable

 

Before starting the creation of a new Basic Product Line, the person responsible must have a detailed plan for the production of the new product, listing all the quantities of materials used, work operations, resources, etc.

 

CASE SUMMARY

The person in charge of the production, Peter the Producer, wants to create a basic assembly line for a new LARA3 tent. He first creates a new ident in the ident code list and then enters the materials and work operations in the basic assembly line of the ident according to a pre-prepared plan. It then adds alternatives to the assembly and attaches an instruction document to the assembly. The created cut sheet is saved in the history where it is always available for consultation in case you want to modify the cut sheet at a later stage. At the end of the process, it performs a pre-calculation to check the manufacturing costs of the new product.

 

The process of creating a Basic Plot in PANTHEON is best illustrated by the diagram below.

 

Process description:

  1. Ident Preparation– before starting the creation of the Basic Piece List, the ident must be properly prepared in the Ident Shifter.
  2. Creating a cutting line– creating a new Basic cutting line starts with entering Materials and Work operations according to a predefined plan.
  3. Create alternatives– with the Add an alternative tool we have the possibility to add alternatives to the Basic Piece List.
  4. History record We store the cuttings in a history where they are always available for consultation.
  5. Document loading– we include documentation used during the production process in the batch book.
  6. Precalculation We calculate the manufacturing costs of products or semi-finished goods that are produced in a manufacturing process by selecting different criteria.

 

HINT

For an example of how to create a production identity, see Entering a production identity.

 

 

  

     


Rate this topic
Was this topic usefull?
Comments
Comment will also bo visible in forum!