Scheduling Reports

The Scheduling Report form allows you to generate different reports from tehe Schedule plan, according to the parameters chosen in the form.
You can open the form by clicking the
(Reports) button in the toolbox of the Schedule plan form.

Below is a description of the form’s features.
Here you can select the type of report you want to generate.
 |
HINT
You can generate a report by double clicking the report type.
|
By default, there are four types of reports:
- Material Requirements by Deadlines – contains the data about the material requirements by deadlines or by month.
- Material Requirements by Tools – contains the data about material requirements by tools.
- 468 – Material requirements by tools
- Material Requirements by Resources – contains the data about material requirements by resources.
- Material Requirements by Employees – contains the data about material requirements by employees.
- 46A – Material requirements by employees
In this section, select the item types for which you want the report, by checking the checkbox next to the desired item type.
In this section, select the criteria for the report.
Item
|
Select or enter the ID of an item for the report.
|
Name
|
Select or enter the name of an item for the report.
|
Prim. Cat.
|
Select or enter the primary category of the items for the report.
|
Sec. Cat.
|
Select or enter the secondary category of the items for the report.
|
From
|
Enter the start date of the period of the report.
|
To
|
Enter the end date of the period of the report.
|
Only Negative Qty
|
By selecting this field, only negative quantities will be shown on the report.
The field is visible only if one of the Material Requirements by Deadlines reports is selected.
|
Only Plan Data
|
By selecting this field, only data from the plan will be shown on the report.
The field is visible only if one of the Material Requirements by Deadlines reports is selected.
|
Data Related to Plan
|
By selecting this field, only data related to the plan will be shown on the report.
The field is visible only if one of the Material Requirements by Deadlines reports is selected.
|
Recalculation Parameters
|
By selecting this field, recalculation parameters will be included on the report.
The field is visible only if one of the Material Requirements by Deadlines reports is selected.
|
Sort by
|
From the dropdown menu select the criteria that you want the data on the report to be sorted by.
|
Tools
|
Select or enter the tool for the report.
The field is only visible if the Material Requirements by Tools reports are selected.
|
Resource
|
Select or enter the resource for the report.
The field is only visible if the Material Requirements by Resources reports are selected.
|
Employee
|
Select or enter the employee for the report.
The field is only visible if the Material Requirements by Employees reports are selected.
|
Report
|
By clicking the button, you generate the report in the Report Window.
|