PANTHEON™ Help

 Toc
 PANTHEON Help - Welcome
[Collapse]PANTHEON
 [Collapse]Guides for PANTHEON
  [Collapse]Guide for PANTHEON
   [Expand]Settings
   [Expand]Orders
   [Expand]Goods
   [Collapse]Manufacturing
    [Collapse]Manufacturing Scheduling (MF)
     [Expand]Daily Plan
     [Expand]Plans
     [Collapse]Work Orders
       Dynamic Filters
      [Expand]WO for repairs
       Open WO for Repair
       Shortcut Buttons
       Mass WO Closing
       Status bar
       Closing production period
       Create Service WO
       Create Tool Change WO
       Create Tool Change WO
      [Expand]Product Variants
      [Collapse]WO Work Preparation
        Manufacturing Specification
       [Expand]Materials
       [Expand]Operations
        Material WO Requirements
        Commands in Wizards Menu
        Right-click Menu in WO Work Preparation Panel
       [Collapse]Change Manufacturing Spec
         Change Components and Resources
         Change Regulations
         Change Tools
         Change Small Tools
      [Expand]Work Order Details
       Product Waste/Scrap
      [Expand]Create WO
       Transfer Sales Orders to WO
       Change WO Doc. Type
      [Expand]Process WO
      [Expand]Mass WO Processing
      [Expand]Delete and Reverse WO
      [Expand]Change WO Status
      [Expand]Merge WOs
      [Expand]Split WO
       Report
      [Expand]Work Documentation
       Controllers
     [Expand]Issue Materials
     [Expand]Input Completed Work
      Enter Employee Work
     [Expand]Receiving of Products
     [Expand]Cost Analysis
     [Expand]Track Completed Work
     [Expand]Transfer Completed Work
     [Expand]Administration of Finished Work
     [Expand]Manufacturing Analysis
     [Expand]Finished Work Analysis
     [Expand]Work Order Reports
      Issue Overview
      Manufactured Products Overview (Serial Numbers)
     [Expand]Examples
    [Expand]Simple Manufacturing
    [Expand]MT Manufacturing
    [Expand]ZEUS production cube
   [Expand]POS
   [Expand]Service
   [Expand]Financials
   [Expand]Personnel
   [Expand]Analytics
   [Expand]Desktop
   [Expand]Help
   [Expand]Messages and Warnings
   [Expand]Additional programs
   [Expand]Old products
  [Expand]Guide for PANTHEON Retail
  [Expand]Guide for PANTHEON Vet
  [Expand]Guide for PANTHEON Farming
 [Collapse]User Manuals for PANTHEON
  [Expand]User Manual for PANTHEON
  [Expand]User Manual for PANTHEON Retail
  [Expand]User manual for PANTHEON Vet
  [Expand]User Manual for PANTHEON Farming
[Collapse]PANTHEON Web
 [Collapse]Guides for PANTHEON Web
  [Expand]Guide for PANTHEON Web Light
  [Expand]Guide for PANTHEON Web Terminal
  [Expand]Guide for PANTHEON Web Legal
  [Expand]Old products Archive
 [Collapse]User Manuals for PANTHEON Web
  [Expand]Getting started PANTHEON Web
  [Expand]User Manual for PANTHEON Web Light
  [Expand]User Manual for PANTHEON Web Terminal
  [Expand]User Manual for PANTHEON Web Legal
  [Expand]Old products Archive
[Collapse]PANTHEON Granules
 [Collapse]Guides for PANTHEON Granules
  [Expand]Personnel Granule
  [Expand]Travel Orders Granule
  [Expand]Documents and Tasks Granule
  [Expand]Dashboard Granule
  [Expand]B2B Orders Granule
  [Expand]Field Service Granule
  [Expand]Fixed Assets Inventory Granule
  [Expand]Warehouse Inventory Granule
 [Collapse]User Manuals for PANTHEON Granules
  [Expand]Getting started
  [Expand]Personnel Granule
  [Expand]Travel Orders Granule
  [Expand]Documents and Tasks Granule
  [Expand]B2B Orders Granule
  [Expand]Dashboard Granule
  [Expand]Field Service Granule
  [Expand]Fixed Assets Inventory Granule
  [Expand]Warehouse Inventory Granule
  [Expand]Archive
[Expand]User Site

Load Time: 374.9862 ms
"
  8293 | 8817 | 339984 | Updated
Label

Change Components and Resources

Change Components and Resources

Change Components and Resources

55369.gif
To display a list in the bottom section select Components and Resources option In Type of Change box of Change Manufacturing Spec window.

 

 

Set criteria in order to change a specific component or norm (in materials and operations) for the selected specification group. Then proceed with selecting a component that you want to change in the selected specifications. Finally, set a new component or enter additional parameters for change in specifications.

Similar procedure is used when changing data in operations where you can change item, name or resource of operations, regulations, tools, etc.

Refresh data generating a list of components that you would like to change in corresponding specifications.

 

 

New Component

Item Enter or select an item that you want to use in the selected specification group.
Resource Specify a resource for the selected operation.

Additional Parameters

Volume Change Mode
  • Nominal - Select it in order to change volume to quantity specified.
  • Percentage- Select it in order to increase or decrease volume (by entering negative value) by the percentage specified.
Volume Enter or select a new volume base.
Materials Enter parameters related to lines of material.
  • Quantity - Enter it in order to change volume.
  • Scrap % - Enter new amount of scrap expressed in percentage.
  • Waste % - Enter new amount of waste expressed in percentage.
Operations Enter parameters related to lines of operations.
  • Tpr - Enter new amount of production time (Tpr) expressed in percentage.
  • Tpsu - Enter new amount of set-up time (Tsu) expressed in percentage.

 

Selecting Refresh generates available data displaying them in Change Components and Resources panel.

Because a great number of data appears only relevant data (material- or operation-related) is displayed.

 

Lines in Change Components and Resources Panel

55373.jpg

....

 

.. plus the remaining part of the bottom section

 

 

Sel. If checked, marks a line to be changed.
WO Enter an ID of work order.

 

Product ID Enter ID of product in order to change component.
Product Name Enter name of product in order to change component.
Line Enter a line number where you want to make changes.

 

Alt. Enter an alternate line where you want to make changes.

 

Component ID Enter an ID of component you want change.
Component Name Enter a name of component you want change.
Lead Time U/M Enter a unit of measurement (U/M) you want change.
Comp. Item Type Enter an ID of item type you want change.
Resource Enter a resource used in the operation.
Batch Specify a number of units in production batch. Number of decimal places can be set in product quantity settings.
Volume Enter a number of units in specification expressed in unit of measurement set. Here the amount of volume is set ranging from 1 to 1,000,000 units.
Norm Enter norm for individual lines.

 

Quantity Enter norm for lines in specification. It is Quantity field for lines of material and Tpr-Norm Production Time for lines of operations
Net/1 Enter net quantity required in order to assemble batch quantities.
Scrap % Enter % of scrap in line of material.
Scrap/1 Enter quantity of scrap in batch production.
Waste % Enter % of waste in line of material.
Waste/1 Enter quantity of waste in batch production.
Gross/1 Displays gross quantity required in order to assemble batch quantities.
Tpr/1 Enter production time required per batch or assembly unit.
Tsu1 Displays set-up time required for production of series.
New Volume Enter or select a NEW number of units in specification expressed in unit of measurement set. Here the amount of volume is set ranging from 1 to 1,000,000 units.
New Qty/1 Enter NEW norm for lines in specification. It is Quantity field for lines of material and Tpr-Norm Production Time for lines of operations.
New Net Qty/1 Enter NEW net quantity required in order to assemble batch quantities.
New Scrap % Enter a NEW % of scrap in line of material.
New Scrap/1 Enter NEW quantity of scrap in batch production.
New Waste % Enter a NEW % of waste in line of material.
New Waste/1 Enter a NEW quantity of waste in batch production.
New Gross/1 Enter NEW gross quantity required in order to assemble batch quantities.
New Tpr/1 Enter NEW production time required per batch or assembly unit.
New Tsu/1 Displays NEW set-up time required for production of series.

 

Having clicked Edit you have to confirm the changes. Confirming it by clicking Yes commits change. On the other hand, clicking No discards any changes made and returns you to the initial window.

 

 

 

If you checked Show Log that can be found in the top window section, a log of all changes made in specifications is displayed.

 

 

Clicking print button in the taskbar opens a log report of mass edit specifications.

 

 


 


 

Rate this topic
Was this topic usefull?
Comments
Comment will also bo visible in forum!