Resource cost adjustment

The Resource cost adjustment form allows you to adjust cost on resources. The form can be used to adjust the cost on a single resource, or a whole group of resources at once.
 |
HINT
The predefined 3A0 - Corrections of resource costs procedure is available in SQL-I in ARES. Calling up the SQL procedure can be set in the SQL Interpreter.
|
You can access the form from the Settings | Manufacturing | Resources | Resources menu, by clicking the
(Wizards) button in the toolbar, and selecting Adjust cost on resources from the menu.
 |
WARNING
There are two types of resource costs displayed: set-up and production costs. Fields for each type can be defined in the Administration Panel, of the Settings | Manufacturing | Resources | Resources panel.
You can read more about the set-up and production cost in the section 5. Resource costs of the chapter General.
|

Below is the description of the form’s features.
Resource
|
Enter or select the resource for which you want to adjust the costs.
|
Parent Resource
|
Enter or select the cumulative resource for which you want to adjust the costs. The costs will be adjusted for all subordinate resources.
|
Adjustment Percentage for Set-Up Costs
|
Enter the percentage value of the adjustment multiplier for the set-up costs.
 |
HINT
You can read more about the set-up costs in the section 5.1. Set-Up Costs of the chapter General.
|
|
Adjustment Percentage for Production Costs
|
Enter the percentage value of the adjustment multiplier for the production costs.
 |
HINT
You can read more about the production costs in the section 5.2. Production Costs of the chapter General.
|
|
Confirm
|
By clicking the button, you activate the SQL procedure with the parameters entered.
|