Schedule plan

The Schedule plan form allows you to calculate the material requirements, the resource, and employee avaliability for the production, according to the time frames set in the linked Plan.
The recalculation of scheduled material requirements is performed based on scheduled dismantling. Material requirements are later merged, according to the criteria set in refreshing; schedule settings; setting up scheduling for alternate specifications and specifying merge and deliver-by date, in the Items register.
The Schedule plan form also includes data from the product's BOM, and the technological structure, which is directly linked with resources and calendars. During this process, all data and settings of the registers and procedures, which are linked to the material and workflows of the PANTHEON application, are integrated.
The Schedule plan form can be found in the menu Manufacturing | Plan | Plan, and accessed by selecting Scheduling from the action buttons, or from wizards.

You can find more information about the sections and functionalities of the Schedule plan form in the following chapters:
- Header
- Tabs
2.1. FMP
2.2. Period Overview
2.3. Resources
2.4. Employees
2.5. Recalculation Parameters
- Toolbar
3.1. Wizards
3.2. Scheduling Reports