    [Collapse]Manufacturing Scheduling (MF)
     [Expand]Daily Plan
     [Collapse]Plans
      [Expand]Plan
      [Collapse]Schedule plan
        Header
       [Expand]FMP
        Period Overview
        Resources
        Employees
        Recalculation Parameters
       [Expand]Wizards
       [Expand]Scheduling Reports
     [Expand]Work Orders
     [Expand]Issue Materials
     [Expand]Input Completed Work
      Enter Employee Work
     [Expand]Receiving of Products
     [Expand]Cost Analysis
     [Expand]Track Completed Work
     [Expand]Transfer Completed Work
     [Expand]Administration of Finished Work
     [Expand]Manufacturing Analysis
     [Expand]Finished Work Analysis
     [Expand]Work Order Reports
      Issue Overview
      Manufactured Products Overview (Serial Numbers)
     [Expand]Examples
    [Expand]Simple Manufacturing
    [Expand]MT Manufacturing
    [Expand]ZEUS production cube
   [Expand]POS
   [Expand]Service
   [Expand]Financials
   [Expand]Personnel
   [Expand]Analytics
   [Expand]Desktop
   [Expand]Help
   [Expand]Messages and Warnings
   [Expand]Additional programs
   [Expand]Old products
  [Expand]Guide for PANTHEON Retail
  [Expand]Guide for PANTHEON Vet
  [Expand]Guide for PANTHEON Farming
 [Collapse]User Manuals for PANTHEON
  [Expand]User Manual for PANTHEON
  [Expand]User Manual for PANTHEON Retail
  [Expand]User manual for PANTHEON Vet
  [Expand]User Manual for PANTHEON Farming
[Collapse]PANTHEON Web
 [Collapse]Guides for PANTHEON Web
  [Expand]Guide for PANTHEON Web Light
  [Expand]Guide for PANTHEON Web Terminal
  [Expand]Guide for PANTHEON Web Legal
  [Expand]Old products Archive
 [Collapse]User Manuals for PANTHEON Web
  [Expand]Getting started PANTHEON Web
  [Expand]User Manual for PANTHEON Web Light
  [Expand]User Manual for PANTHEON Web Terminal
  [Expand]User Manual for PANTHEON Web Legal
  [Expand]Old products Archive
[Collapse]PANTHEON Granules
 [Collapse]Guides for PANTHEON Granules
  [Expand]Personnel Granule
  [Expand]Travel Orders Granule
  [Expand]Documents and Tasks Granule
  [Expand]Dashboard Granule
  [Expand]B2B Orders Granule
  [Expand]Field Service Granule
  [Expand]Fixed Assets Inventory Granule
  [Expand]Warehouse Inventory Granule
 [Collapse]User Manuals for PANTHEON Granules
  [Expand]Getting started
  [Expand]Personnel Granule
  [Expand]Travel Orders Granule
  [Expand]Documents and Tasks Granule
  [Expand]B2B Orders Granule
  [Expand]Dashboard Granule
  [Expand]Field Service Granule
  [Expand]Fixed Assets Inventory Granule
  [Expand]Warehouse Inventory Granule
  [Expand]Archive
[Expand]User Site

Load Time: 468.7397 ms
"
  4603 | 5313 | 338446 | Updated
Label

Resources

The Resources tab of the Schedule plan form offers a detailed view over capacity, planned time for the operation, availability, and other data about resources and planed work on said resources.

The tab is divided into two sections. The first one displays the data about resources, and the second one contains three tabs with data about planned products produced, prepared WOs, and processed WOs on a chosen resource line.

WARNING

The Resources tab is available only if Resource scheduling was chosen when the schedule plan was calculated in the Refresh schedule plan form.

 

HINT

For more information about the Schedule plan, see the chapter Schedule plan.

 

Below is a description of the form’s features:

Table of contents

  1. Resources
  2. Tabs
    2.1. Planned Products
    2.2. Prepared WO
    2.3. Processed WO

1. Resources

In this section, all the data about resources planned for production is displayed.

Resource

Displays the ID of the resource from the Resources register.

Resource Name

Displays the name of the resource from the Resources register.

Work From

Displays the start time of resource capacity, set in the Resources register.

Work To

Displays the end time of resource capacity, set in the Resources register.

Capacity

Displays resource capacity, which is calculated based on the daily resource capacity and the plan period that can be found in the Plan.

Planned Time

Displays the planned time required in production.

Planned Time of Prep. WO

Displays the planned time required in production, that is, in planned WOs having the status O - Open, R - Released or I - Allocated.

Planned Time of Proc. WO

Displays the planned time required in production, that is, in WOs that are in progress and have the status D - In Progress and E - Partially Finished.

Planned Time Total

Displays the total planned time.

Occupied (%)

Displays how occupied the resource actually is, expressed in percentages. It is calculated based on the total planned time and resource capacity.

Avail. Planned Time

Displays the available planned time, that is, the available resource capacity. It is calculated as the difference between the resource capacity and planned time.

Available (%)

Available planned time or resource capacity expressed in percentages.

Cycle Time

Displays the cycle time required in production.

Prep. WO Cycle Time

Displays the cycle time required in production, that is, in planned WOs with the status O - Open, R - Released or I - Allocated.

Process WO Cycle Time

Displays the cycle time required in production, that is, in WOs that are in progress and have the status D - In Progress and E - Partially Finished.

Total Cycle Time

Displays the total cycle time.

2. Tabs

Tabs contain additional data for the resource line chosen in the table. There are three tabs with data about planed products for the resource line, operations on prepared WOs, and processed WOs for the resource line.


2.1. Planned Products

Item

Displays the ID of the item from the Items register.

Name

Displays the name of the item from the Items register.

End Date

Displays the end date of resource requirement.

Start Time

Displays the start time of the work on the resource.

Quantity

Displays the quantity of the item.

U/M

Displays the unit of measurement of the item.

Planned Time

Displays the planned time required in production.

Cycle Time

Displays the cycle time required in production.

Item Type

Displays the item type of the item.

Prim. Cat.

Displays the primary category of the item.

Sec. Category

Displays the secondary category of the item.


2.2. Prepared WO

WO

Displays the number of the WO.

WO Status

Displays the WO status.

Line

Displays the number of the plan line.

Alt.

Displays an alternate line of the item in the manufacturing specification.

Operation

Displays the ID of the operation from the Items register.

Operation Description

Displays the name of the operation from the Items register.

Start Time

Displays the start time of the operation.

End Time

Displays the end time of the operation.

Planned Time

Displays the time planned for the operation.

Cycle Time

Displays the cycle time required in production.

2.3. Processed WO

WO

Displays the number of the WO.

WO Status

Displays the WO status.

Line

Displays the number of the plan line.

Alt.

Displays an alternate line of the item in the manufacturing specification.

Operation

Displays the ID of the operation from the Items register.

Operation Description

Displays the name of the operation from the Items register.

Start Time

Displays the start time of the operation.

End Time

Displays the end time of the operation.

Planned Time

Displays the time planned for the operation.

Cycle Time

Displays the cycle time required in production.

 

 


 