Acidity Adjustments
Acidity Adjustments
In this window all tasks connected with acidity adjustments are recorded. Tasks can be inserted by individual wine sort and serial number of wine. Task can be inserted for more than one container at the time under condition that wine of same type and serial number is in containers. Task recording is starded with click on New Record.
Each individual task creates newwork order which includes all the costs of the task.
General Data
This part contains information about work order.
Processing date |
Date of processing (today's date by default).
|
End date |
Date of end task (today's date by default). |
Wine Variety (item) |
Wine variety is selected from drop-down. You can select from wine variesties with specific serial numbers in stock. |
Serial number |
If there are more serial numbers, you can select correct serial. |
Note |
Notes. |
Status |
Status is allocated automatically through the process (once process is saved, cycle closes automatically). You can manually change it. |
Total Wine Qty |
Total wine quantity in selected wine containers. |
Selected Wine Quantity |
Selected wine quantity (can be lower than total). Filled automatically based on selected wine containers. |
Shrinkage (wine) |
Qunatity of wine, that is removed from the process (shrinkage). |
Labor total (hrs) |
Number of hours used for a task. Hours ca be added directly to individual worker, or can be added as total number, which will be calculated to individual worker. |
Work order |
Number of work order which opens with double click.
|
Details
Task contains detailed information about wine. If information on wine, not the task, was already recorded on previous task, it will be transfered to next one.

Sugar Scale |
Sugar scale unit is selected from drop-down..
|
Sugar Content |
Based on sugar scale selection, sugar content is selected. |
Total Acidity |
Total acidity of wine. |
pH |
pH of wine. |
Initial Sulfuring |
Initial sulfuring value. |
Note |
User's note. |
Cooling Start |
Date of cooling start. |
Initial Temperature |
Initial wine temeprature. |
Cooling End |
Date of cooling end. |
Final Temperature |
Final wine temperature. |
Wine for Processing
In this table there is a list of containers, that sotre selected wine. You can select all wine, just one container or smaller quantity from container.

Select |
Field for selection.
|
Cellar (subj) |
User selects a cellar, where container is situated. |
Container (subj) |
User selects a container, where wine is placed. |
No. |
Number of container. |
Wine Type |
Wine type is selected automatically from container. |
Volume |
Volume of container. |
Stock |
Stock of wine in container. |
Container Type |
Container type. Information is added automatically. |
U/M |
Unit of measurement. |
Document |
Number of created document. |
Fixed Assets
In fixed assets table user selects fixed asset that was used in the process. User can select fiex asset if it is recorded in database and marked as equipment. Fixed assets can be searched by name or inventory number.

Workers
User selects workers that were participating in the process. Besides selecting a user, working hours can also be written. If user doesn't know hours done, he can select workers and write total hours in the header of window. Hours will be sistributed to the rest of the workers.

Used Material
Used material is a special seperate division in this window. It is used to insert all the material, that was used in the process. User can insert more tha one material.

Item |
Item as material, used in the process.
|
Name |
Name of the item. |
Wareh. |
Warehouse, where material is stored. |
Dose /hl |
Dosage per hectolitre. |
Quantity |
Quantity of used material. |
U/M |
Unit of measurement of material. |
Document |
Number of created document. |
Used Material by containers
This table calculates quantity of used material per wine container.

Cellar (subj) |
Cellar, where container is situated.
|
Container (subj) |
Container, where wine is placed. |
No. |
Number of entry. |
Material (Item) |
Used material. |
Warehouse |
Issuing warehouse. |
Name |
Name of used material. |
Quantity |
Quantity of material per container. |
U/M |
Unit of measurement. |