Volume |
Set volume to 10, 100, 1000, ... units for viewing cost estimation in the Data panel. |
Item |
Enter or select an item for which you want to perfom cost estimation according to the set criteria. |
Quantity |
Enter quantity of product to perfom cost estimation. |
Currency |
Enter or select code of currency using which to display amounts in cost estimation. |
Priority |
Displays resource priority. Priorities can be set in Resource priority code list (double click in Priority field or go to Settings\Manufacturing\Resources\ Resource priority). |
Cost Estimation Type |
Detailed |
Detailed |
Select a detailed type of cost estimation. |
Summary |
Select a summary type of cost estimation. |
Operation Elements: |
If checked, set up time or custom time will be used in cost estimation. |
Take Into Account Set-up Time |
If checked, it selects whether set-up time will be used in cost estimation or not. When checked set-up time (Tsu) is distributed across optimum product quantity as defined in specification. |
Take Into Account Work Operations |
If checked, work operation will be used in cost estimation. |
Take Into Account Fictional Operations |
If checked, fictional operation will be used in cost estimation. |
Take Into Account Control Operations |
If checked, control operation will be used in cost estimation. |
Take Into Account External Operations |
If checked, external operation will be used in cost estimation. |
Non-time related data |
If checked, external operations are taken into accout in unit of measurement set. It is visible only in case that you set Subcontracting in PANTHEON and checked Take Into Account External Operator. |
2. Prices in Cost Estimation
|
Doc. Type for WO |
Select it to be able to set prices in cost estimation after specifiying document type for manufacturing. Having selected it a field appears where you can enter or select a documnt type to be used in cost estimation. See follow-up.
As mentioned above, after selecting Doc. Type for WO option where cost estimation is performed from settings of document type for manufacturing. Set type of calculation by selecting a document type in the field that appears. All other settings are discarded.
|
(document type for WO) |
Enter or select ID of document type for manufacturing. Prices of materials (as well as semi-finished products and products) in the settings of document types represent the current actual cost of an item (WO Doc. Type Based on Item option). |
Custom |
Select it in order to set prices in cost estimation. |
3. Price of Material in Cost Estimation
|
Purchase Price |
It is determined by the total purchase price of material as set (calculated) in the Purchase panel of Costing in the Items register. |
Retail Price |
It is determined by retail price of material as set (calculated) in the Purchase panel of Costing in the Items register. |
Sale Price |
It is determined by retail price of material as set (calculated) tax excluding in the Purchase panel of Costing in the Items register. |
Wholes. Price 1 |
It is determined by wholesale price (2nd price range) of material as set (calculated) in the Purchase panel of Costing in the Items register. |
Wholes. Price 2 |
It is determined by wholesale price (3rd price range) of material as set (calculated) in the Purchase panel of Costing in the Items register. |
Spec |
It is determined by a price of material as set in the Spec field in the Sale panel of Costing window in the Items register. |
Fixed Price |
It is determined by fixed price as set for a specific item in the Fixed Prices window. |
(selecting a valid date) |
If you select the fixed price option, a field appears where you set the valid date. |
Valuation Price |
It is the current cost of valuated stock from selected warehouse. If Warehouse isn't selected it takes valuated stock price from warehouse where valuated prices is the highest.

|
Formula |
The price of cost estimation is calculated according to the selected formula. Formulas used in calculating prices can be created as described in the topic dealing with formulas. Below you can observe the parameters (operands) used in creating formulas:
MPCENA ........... represents the retail price as set in the Sales panel of the Items register;
VPCENA1 ......... represents wholesale price 1 as set in the Sales panel of the Items register;
VPCENA2 ......... represents wholesale price 2 as set in the Sales panel of the Items register;
SESTAVNICA .. represents the price in spec as set in the Sales panel of the Items register;
- STALNACENA... represents the fixed price as set in Fixed Prices
window; NABACENA ....... represents purchase price as calculated in the Sales panel of the Items register;
CENAZAVRED ... represents the current cost of item stock. |
(enter or select a formula) |
Enter or select a formulat for calculating cost of material in cost estimation. |
4. Price of Operations in Cost Estimation
|
Spec |
It is determined by a price of operations as set in the Spec field in the Sale panel of the Costing window in the Items register. |
Formula |
The price of cost estimation of operation is calculated according to the selected formula. Formulas used in calculating prices can be created as described in the topic dealing with formulas. Below you can observe the parameters (operands) used in creating formulas:
RESURSTPZ1 … represents fixed cost of resource 1 … that is, the first field of set-up resource cost
; RESURSTPZ2 … represents fixed cost of resource 2 … that is, the second field of set-up resource cost;
RESURSTPZ3 … represents fixed cost of resource 3 … that is, the third field of set-up resource cost
RESURSTPZ4 … represents the fixed cost of resource 4 … that is, the fourth field of set-up resource cost;
RESURSTPZ5 … represents fixed cost of resource 5 … that is, the fifth field of set-up resource cost;
RESURSTN1 ….. represents variable resource cost 1 … that is, the first field of production resource cost;
RESURSTN2 ….. represents variable resource cost 2 … that is, the second field of production resource cost;
RESURSTN3 ….. represents variable resource cost 3 … taht is, the third field of production resource cost;
RESURSTN4 ….. represents variable resource cost 4 … that is, the fourth field of resource cost;
RESURSTN5 ….. represents variable resource cost 5 … that is, the fifth field of production resource cost.
|
(enter or select a formula) |
Enter or select a formula for calculating cost of operations in cost estimation. |