PANTHEON™ Help

 Категории
 PANTHEON Help - Welcome
[Collapse]PANTHEON
 [Collapse]PANTHEON упатства
  [Collapse]Guide for PANTHEON
   [Expand]Settings
   [Expand]Orders
   [Expand]Goods
   [Collapse]Manufacturing
    [Collapse]Manufacturing Scheduling (MF)
     [Expand]Daily Plan
      Načrtovanje delovnega časa
     [Expand]Plan
     [Collapse]Work Orders
       Dynamic Filters
      [Expand]WO for repairs
       Shortcut Buttons
       Отворете WO за Ремонт
       Mass WO Closing
       Status bar
       Closing production period
       Създайте услуга WO
       Създайте инструмент за смяна WO
       Създайте инструмент за смяна WO
       Създайте инструмент за смяна WO
      [Expand]Product Variants
      [Collapse]WO Work Preparation
        Manufacturing Specification
       [Expand]Materials
       [Expand]Operations
        Material WO Requirements
        Commands in Wizards Menu
        Right-click Menu in WO Work Preparation Panel
       [Expand]Change Manufacturing Spec
      [Expand]Work Order Details
       Product Waste/Scrap
      [Expand]Create WO
       Transfer Sales Orders to WO
       Change WO Doc. Type
      [Expand]Process WO
      [Expand]Mass WO Processing
      [Expand]Delete and Reverse WO
      [Expand]Change WO Status
      [Expand]Merge WOs
      [Expand]Split WO
      [Expand]WO Scheduling
       Report
      [Expand]Work Documentation
       Controllers
     [Expand]Issue Materials
     [Expand]Input Completed Work
      Enter Employee Work
     [Expand]Receiving of Products
     [Expand]Cost Analysis
     [Expand]Track Completed Work
     [Expand]Transfer Completed Work
     [Expand]Administration of Finished Work
     [Expand]Manufacturing Analysis
     [Expand]Finished Work Analysis
     [Expand]Work Order Reports
      Issue Overview
      Manufactured Products Overview (Serial Numbers)
     [Expand]Examples
    [Expand]Simple Manufacturing
    [Expand]MT Manufacturing
    [Expand]ZEUS production cube
   [Expand]POS
   [Expand]Service
   [Expand]Financials
   [Expand]Personnel
   [Expand]Analytics
   [Expand]Desktop
   [Expand]Помощ
   [Expand]Старите продукти
   [Expand]Messages and Warnings
   [Expand]Additional programs
  [Expand]Ръководство за PANTHEON Търговия
  [Expand]Ръководство за PANTHEON Vet
  [Expand]Ръководство за PANTHEON Фермерство
 [Collapse]PANTHEON потребителски ръководства
  [Expand]Ръководство за потребителя за PANTHEON
  [Expand]Ръководство за потребителя за PANTHEON Retail
  [Expand]Ръководство за потребителя за PANTHEON Vet
  [Expand]Ръководство за потребителя за PANTHEON Farming
[Collapse]PANTHEON Web
 [Collapse]PANTHEON Web Guides
  [Expand]Ръководство за PANTHEON Web Light
  [Expand]Ръководство за PANTHEON Уеб Терминал
  [Expand]Ръководство за PANTHEON Web Legal
  [Expand]Архив на стари продукти
 [Collapse]PANTHEON Web User Manuals
  [Expand]Започване на PANTHEON Web
  [Expand]User Manual for PANTHEON Web Light
   Ръководство за потребителя за PANTHEON Web Terminal
  [Expand]Ръководство за потребителя за PANTHEON Web Legal
  [Expand]Архив на стари продукти
[Collapse]PANTHEON Гранула
 [Collapse]Ръководство за PANTHEON Гранули
  [Expand]Гранула за служители
  [Expand]Пътни заповеди Гранула
  [Expand]Гранула за документи и задачи
  [Expand]Гранула Табло
  [Expand]Гранула за B2B поръчки
  [Expand]Гранула за обслужване на клиент
  [Expand]Инвентаризация на дълготрайни активи
  [Expand]Гранула за складови наличности
 [Collapse]PANTHEON Granules
   Започване
   Using PANTHEON Granules at Tecta, a fictional company
  [Expand]PANTHEON Granules and activation
  [Expand]PANTHEON Granule Work records
  [Expand]PANTHEON Granule Travel orders
  [Expand]PANTHEON Granule Documents and Tasks
  [Expand]PANTHEON Granule B2B orders
  [Expand]PANTHEON Granule Dashboard
  [Expand]Полеви сервизен гранул
   PANTHEON Granules - FAQ
  [Expand]Инвентаризация на дълготрайни активи
  [Expand]Инвентаризация на склада Гранула
   Архив
[Expand]Потребителски сайт

Load Time: 390,6302 ms
"
  8122 | 8632 | 404089 | Localized
Label

Operations

Operations

Operations

54825.gif

The following tabs can be found in the Operations panel of manufacturing specification:

- General

- User-defined Fields

- Regulations

- Production

- Material

 

Lines in Operations Panel:

Alt. Enter or select an alternate specification where a line can be found.
(+) Clicking (+) opens additional lines related to this operation. In other words displays materials to be integrated in assembly when executing the operation. Which of the above-mentioned lines are integrated in assembly during specific operations can be defined by appropriate sequence of line numbers. Typically, most lines of materials are integrated during the first operation being assigned a smaller number than the related materials.

 

Lines of Individual Operations

Alt. Enter or select alternate line of assembly.
Line Enter a consecutive number of line.
Item Displays an item in line.
Description Displays description of item.
Line Displays number of the selected line in ascending order as defined in product specification.
Operation Enter or select an operation ID.
Name Enter or select a name of the item. Clicking + displays additional description. If additional description already exists in line, the icon is grey and displayed in bold type.
Batch Displays number of units in production batch.
Time Displays total standard time required for operation. It includes production time (Tpr) and set-up time (Tsu).
Used Displays the amount of working hours used for operation.
U/M Enter or select a unit of measurement for production time.
Priority Displays resource priority. Priorities can be set in Resource priority code list (double click in Priority field or go to Settings\Manufacturing\Resources\ Resource priority).
Resource

 

Select an ID of resource where operations is executed. 

Optional field: In order to calculate production costs select number of resources when executing an operation.

Operation can be executed on multiple resources.

(Resource Name) Displays name of the selected resource.
Execution % Dislplays the % of resource usage.
Pcs.

Displays the planned quantity per resource

Tpr

 

Enter production time required for assembly production.
Pcs/UM Displays a time unit in which to express production time.
Tsu

 

Enter set-up time required for production of specified quantities expressed in the selected unit - assembly series.
U/M

 

Displays the main unit of measurement according to the time constant.
U/M Time

 

Enter or select unit of measurement for time.
Formula

 

Enter or select a formula in order to calculate quantity of work required for manufacturing a certain amount of product.
Oper. Type Enter or select among the following types of operations: Work Operation, Fictional Operation, Control Operation, External Operation.
Spec Qty Enter quantity in case of external operation (e.g. sub-contracting).
Volume Enter or select number of units in assembly ranging from 1 to 1,000,000 units for which production time was set. That is, if you select 1,000 units, the production time is expressed for production of 1000 units.
Spec U/M Enter or select the main unit of measurement used for quantity in line of external operation.
Offset Type Select an offset type between the previous and this operation marking in which sequence the operations are performed: Simultaneous to previous, After previous has finished, Time offset, Quantity offset.
Offset

 

Enter offset time between the two operations.
Salary Grade

 

Optional field: In order to calculate production costs select a salary grade for employees when executing an operation. Enter it manually. Otherwise it is filled-in when you enter resource. That is, if you have not already entered salary grade or when it is the same as the one set in the previous line.
Bonus

 

Optional field:In order to calculate production costs.select a bonus for employees when executing an operation.

 

Start Enter or select date and time when the operation started. It can be found in scheduled data when releasing work orders or changing data when editing operation in manufacturing specification.
End Enter or select date and time when the operation ended. It can be found in scheduled data when releasing work orders or changing data when editing operation in manufacturing specification.
Active If checked, shows that a line is active and you are able to create report of work documentation.
Finished If checked, displays that the operation was finished. Plus it tells you that it was entirely finished.
Item Type Displays item type.
Prim. Class. Displays an ID of primary category of item.
Sec. Class Displays an ID of secondary category of item.
Tpr/1 Displays production time required per batch or assembly unit.
Tsu1 Displays set-up time requird for productio of series.
Tpr/Volume Displays production time according to volume.
Tsu/Volume Displays set-up time according to volume.

 

Altering product specification on work order specification is colored.

If you add different operations the record will be colored in blue.


 


 

Оценете темата
Темата беше ли ви полезна?
Коментар
Вашият коментар ще бъде видим и във форума!