PANTHEON™ Help

 Toc
 PANTHEON Help - Welcome
[Collapse]PANTHEON
 [Collapse]Guides for PANTHEON
  [Expand]Guide for PANTHEON
  [Expand]Guide for PANTHEON Retail
  [Expand]Guide for PANTHEON Vet
  [Expand]Guide for PANTHEON Farming
 [Collapse]User Manuals for PANTHEON
  [Collapse]User Manual for PANTHEON
   [Expand]Getting Started
   [Expand]User Manual for eBusiness
   [Expand]Settings
   [Expand]Orders
   [Expand]Goods
   [Collapse]Manufacturing
    [Expand]Plans
    [Expand]Daily Plan
     Foreword
    [Expand]Basic Concepts in Manufacturing Planning and Processing
    [Collapse]Organizing Manufacturing Process and Material Flows
      Material Movements in Production
      Optimizing Material Movements in Production
      Optimizing Material Movements in Multiple Sell Production
      Monitoring Sub-contracting
   [Expand]Service
   [Expand]Help
   [Expand]Personnel
   [Expand]Financials
   [Expand]Analytics
  [Expand]User Manual for PANTHEON Retail
  [Expand]User manual for PANTHEON Vet
  [Expand]User Manual for PANTHEON Farming
[Collapse]PANTHEON Web
 [Collapse]Guides for PANTHEON Web
  [Expand]Guide for PANTHEON Web Light
  [Expand]Guide for PANTHEON Web Terminal
  [Expand]Guide for PANTHEON Web Legal
  [Expand]Old products Archive
 [Collapse]User Manuals for PANTHEON Web
  [Expand]Getting started PANTHEON Web
  [Expand]User Manual for PANTHEON Web Light
  [Expand]User Manual for PANTHEON Web Terminal
  [Expand]User Manual for PANTHEON Web Legal
  [Expand]Old products Archive
[Collapse]PANTHEON Granules
 [Collapse]Guides for PANTHEON Granules
  [Expand]Personnel Granule
  [Expand]Travel Orders Granule
  [Expand]Documents and Tasks Granule
  [Expand]Dashboard Granule
  [Expand]B2B Orders Granule
  [Expand]Field Service Granule
  [Expand]Fixed Assets Inventory Granule
  [Expand]Warehouse Inventory Granule
 [Collapse]User Manuals for PANTHEON Granules
  [Expand]Getting started
  [Expand]Personnel Granule
  [Expand]Travel Orders Granule
  [Expand]Documents and Tasks Granule
  [Expand]B2B Orders Granule
  [Expand]Dashboard Granule
  [Expand]Field Service Granule
  [Expand]Fixed Assets Inventory Granule
  [Expand]Warehouse Inventory Granule
  [Expand]Archive
[Expand]User Site

Load Time: 515.6077 ms
"
  44 | 50 | 335753 | Updated
Label

Optimizing Material Movements in Production

Optimizing Material Movements in Production

Optimizing Material Movements in Production

67062.gif

When optimizing material movements you have to be aware that every item also includes an ID and it is also assigned with an item type. Item type tells you whether the item is raw material, semi-finished product, packaging or something else.

It means that the very ID of material should tell you at which warehouse it is placed and how will it be posted (Each document type is used for specific posting. It tells you to which accounts will an item type be posted.). To illustrate a posting method depending on type of posting of document types see Automatically Posting Invoices Issued).

Let us suppose that item types are marked in the following way:

Raw material
500
Material
Packaging
Product
Semi-finished product
Scrap
Waste
For sake of explanation we will deal with item types later on.

Considering this we can make the scheme from the previous topic easier.

67063.gif

In the first step we joined a warehouse for storing raw materials, a warehouse for storing materials and that for storing packaging into one single warehouse. What type of items are stored at warehouse (raw material, material, packaging) can be observed from the item ID and the corresponding item type.

Hence there is no need for using two document types of issue.

Looking more precisely at the scheme you can see that production is also fed from the warehouse for storing semi-finished products. Because production is usually performed in multiple stages, the semi-finished product is created in the first stage. It is then placed at the product warehouse. Transfer them to the warehouse for storing semi-finished products so that they can be used in the next stage in production. Besides having the existing movements of receiving and issue you get additional documents from interwarehouse transferring. Can it be done away with this?

By all means, in the second step we join the product warehouse with the warehouse for storing semi-finished products.

67064.gif

The scheme was changed so that the same warehouse has both the role of warehouse for issuing semi-finished products (receiving in production) and warehouse for receiving semi-finished products and products (issuing from production).

Finally, in the third step, let us take a look at scrap and waste.

To reuse scrap in production in a similar way you use raw materials then it is wise you join warehouses for storing scrap and waste.

67065.gif

67066.gif To reuse scrap in production you have to ask yourself the following: a.) whether a special item type should be asssigned for scrap or whether they will be treated as raw materials? b.) whether scrap should be assigned its own ID or whether the ID for raw materials will be used? Decisions you take can further simplify Item Types and Items registers.
67067.gif If scrap is assigned its own ID or as its own item type, specify it in the specifications because they could be substituted for "regular" raw materials.

If you use scrap as waste, that is, not reusing them in production, you can change the scheme like this:

67068.gif

The following documents will be created should you use the above example:

work order issues:

67069.gif 67070.gif
work order receiving:
67071.gif 67072.gif
What are the savings by optimizing material movements in production?
Documents
Non-optimized
Scrap=Raw Material
Scrap=Waste
Work Orders
1
Issues
2
Receipts
3
Transfers
0
All documents

6

Warehouses

3

It can be observed that 2 warehouses are redundant plus 3 to 4 documents for each work order. Supposing that you process 1000 work orders a year you will use 3000 or 4000 documents less. That is a considerable number processing of which increases costs.

67073.gif Taking a moment in organizing production can save you months of work!



 

Rate this topic
Was this topic usefull?
Comments
Comment will also bo visible in forum!