Погледнете ги упатствата за PANTHEON™

 Categories
[Expand]User Manual for DataLab PANTHEON 5.5
 No formula defined!
[Collapse]Datalab PANTHEON 5.5 Guide
 [Expand]Orders
 [Collapse]Settings
  [Expand]Subjects
  [Expand]Items
  [Collapse]Manufacturing
   [Expand]Resources
   [Collapse]Setting-up Specifications
    [Collapse]Product Specification
      Spec History
     [Expand]Setting-up and Editing a Product Specification
     [Expand]Task Bar
      Creating a Specification
      General
     [Expand]Specification Alternates
      Subcontracting in Specifications
     [Expand]Add Lines of Material
     [Collapse]Add Lines of Operations
       Specifying Lines of Operations
       General
       User-Defined Fields
       Regulations
       Manufacture Time
    [Expand]Tools
   [Expand]Calendar
   [Expand]Regulations
    Hold-Up Types
    Scrap Reasons
    Subsidiary Accounts Overview
   [Expand]Formula Builder in Manufacturing Module
  [Expand]Personnel
   Calendar
  [Expand]Financials
  [Expand]Customs
  [Expand]Program
 [Expand]Manufacturing
 [Expand]Goods
 [Expand]Service
 [Expand]Financials
 [Expand]Personnel
 [Expand]ZEUS Business Intelligence System
 [Expand]Desktop
  Web Portals
  Extra
 [Expand]Datalab Software System Environment
 [Expand]Messages and Warnings
 [Expand]Additional Programs
 Opening or closing round bracket missing!
 Debugging Formulas
[Expand]Testing and Debugging Formulas
 Opening or closing square bracket missing!
 Conditional statement at position x not enclosed in square brackets!
 Syntax error in conditional statement. Correct syntax is [condition:value]
 Adjacent operators (xx)!
 Last character of the formula is an operator!
 Variable not enclosed in hashes (#)!
 Illegal characters: xyz
 Unknown error!
[Expand]User Manual for Datalab PANTHEON Farming
[Expand]User Site
 Adjacent hashes!
 The line number must be an integer (#xx#)!
 The first character of #xx# must be a transaction type or a column mark!
 The first character of #xx# must be an operation type (R, S, O or A)!
 The second character of #xx# must be a transaction type (D, K, S, P, or O)!
 Variable not defined
[Expand]Kralicek Quicktest Financial Ratios

Load Time: 656,2629 ms
print   |
Label

General

General

010383.gif

 

General information about operation that can be found in lines can also be viewed in the panel of the same name. Here you can set time-related standard data; performer in question and optionally you can set resource and control regulations. You can set optional fields in the Active Fields box in Administration Panel | Program Parameters | Manufacturing | General. Below you can see all possible fields.

 

37705.jpg

 

Tpr
Enter production time required for assembly. It is variable production time of operation. It is expressed in the time unit required in batch production - "Batch" (Usually, it is set to 1 in single item production).
XXX/TU (temporal unit) Displays volume produced per hour. You can modify it if required.  
Tsu
Enter set-up time required for production of specified quantities expressed in the selected U/M - assembly series. It is fixed production time required for preparation of resources in series production.
U/M:
Enter or select a time unit in which to express production time.  
Batch
Displays number of units that in batch (number of units of measurement, charge, the minimum required production amount - actual production amount must be its multiplier). You can modify if required. The required production amount is given for batch specific U/M (number).
Formula
Enter or select a formula in order to calculate amount of work required to produce a certain quantity.
 
Volume
Enter or select number of units in assembly ranging from 1 to 1,000,000 units for which production time was set. That is, if you select 1,000 units, the production time is expressed for production of 1000 units.
(U/M)
Enter or select a time unit in which to express production time. Select it according to the specification's settings.
Quantity
Enter or select a quantity of time unit. Select it according to the specification's settings.
Volume
Enter or select a time unit in which to express production time. Select it according to the specification's settings.
U/M
Enter or select a time unit in which to express production time. Select it according to the specification's settings.
Operation Type
Enter or select a type of operation: Work Operation which is intended for specifying regular operations; Fictional Operation which is intended for specifying any optional information regarding work and control operations; Control Operation which is intended for checking quality control; External Operation which is intended for specifying operations that are outsourced to external subcontacting entities.
Offset Type
Enter or select a type of offset (between previous operation and the one in question) in workflow sequence: Simultaneously to previous - an operation type defining the sequence between the previous and the operation in question; After previous has finished - an operation type carried out after the previous has finished; Time offset - an operation type carried out after you enter working hours in the field appearing after having selected this option. That is, Tpr of the previous operation must be less or equal to the Tpr of the operation in question; Quantity Offset - Basically the same as with Time offset option the only difference being that time offset per product quantity is considered for previous operation (offset = quantity × Tpr previous).
(Time Offset/quantity)
An optional field appears after having selected time or quantity offset type. Enter the appropriate amounts.
Resource
Set a production resource for operation. Enter or select it from available criteria such as ID, type, name or parent resource ID.
(Name of Resource)
Displays the name of selected resource.
No. of Workers
Optional field: When executing an operation select number of resoruces in order to calculate production costs.  
Salary Grade
Optional field: When executing an operation select a salary grade for employees to be able to calculate production costs. Enter it manually. Otherwise it gets filled in when you enter resource. That is, if you haven't already entered salary grade or when it is the same as the one set in the previous line.
Bonus
Optional field: When executing an operation, select a bonus in order to calculate production costs.
 

 

You can further edit lines of operation in the Tools panel in bottom section. First enter or select an appropriate tool that you previously defined as fixed asset or small tool.

To specify tools, you can use various criteria such as ID, name, and validity. In the end enter quantity of the tools to be used in operation.

Set any number required for carrying out the operation.

 

37706.jpg

 

Tool
Enter or select a tool for operation. After having selected it, you can observe the current availability of tool as specified in Fixed Assets or Small Tools.
Name
Displays a name of tool.  
Quantity
Enter quantity of tool used in the operation.  
Scheduling
If checked, it displays whether a tool is scheduled for use as has been previously specified in the Fixed Assets or Small Tools register.
Status
Displays an ID of status of tools as specified in the Fixed Assets or Small Tools register.  
Status
Displays a name of status.  
Note

Note

Enter a note to individual lines ot tools.
000100.gif Click it to create a tools reports which you can subsequently print. For a more detailed treatment see next topic.
 

 

 

You can further edit lines of operation in the Small Tools panel in bottom section. Enter or select a small tool which has to be set in the Items register.

 

Set any number of small tools required for carrying out the operation.

 

37707.jpg

 

Tool
Enter or select a small tool for operation. After having selected it, the quantity available is shown as specified in the Items register.
Name
Displays a name of small tool.  
U/M Enter or select a unit of measurement.

 

Quantity
Enter quantity of tool used in the operation.  
Note

Note

Enter a note to individual lines of small tools.


Rate this topic
Was this topic usefull?
Comments
Comment will also bo visible in forum!